Laserfiche WebLink
Front Yards <br /> <br /> 1. Residential - Same as Project Area 1. <br /> <br /> 2. Commercial/Professional Front yard depth shall be <br /> the same as prevailing building lines or minimum of <br /> 15 feet whichever is less. <br /> <br />Side Yards <br /> <br />1. Residential - Same as Project Area 1. <br /> <br />Commercial/Professional - Side yard shall not be less <br />than four (4) feet. If lot width exceeds forty (40) <br />feet then side yard minimum shall increase by 10% of <br />that amount in excess of forty (40) feet not to ex- <br />ceed eight (8) feet. <br /> <br /> <br />