My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2089 - Rezoning Certain Properties
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1990 (NS-2047 - NS-2104)
>
NS-2089 - Rezoning Certain Properties
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:03:20 PM
Creation date
6/26/2003 10:08:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2089
Date
10/15/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DI~,FT (August 7, 1990) <br /> <br />Possible walcr erosion during construction shall be mitigated by thc installation of <br />temporary erosion control dm'icm by the project applicant, as required by the State <br />Regional Water Ouality Control Board. <br /> <br />~Timin_e of Implementation/Verification: Prior to grading permit issuance and during <br /> grading operation <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Res_r~nsible Part~. <br /> <br />Verification (Name & Date): <br /> <br />Sr. Plan Check Engineer, Budding Division <br /> <br />77:L <br /> <br />Utilization of desiltation devices such as sandbags in areas that may discharge into <br />city streets shall be implemented by the project applicant prior to the commencement <br /> <br />of grading activities. <br /> <br />Timin_o of Implementation/Verification: <br /> <br />~Res~onsible Pan'v: <br /> <br />Vg:rification (Name a Date): <br /> <br />Prior to grading permit issuance <br /> <br />Grading plan check and field inspection <br /> <br />Sr. Plan Check Engin~r, Building Division <br /> <br />The grading plan prepared by thc applicant shall include a description of haul routes, <br />access points to the site, and a watering and sweeping program designed to minimize <br />impacts of haul operations. <br /> <br />Tirnin_e of ImplementationNerification: <br /> <br />Prior to approval of any grading permits <br />and implementation during grading phase <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Sr. Plan Check Enginerr, Building DMsion <br /> <br />Verification (Name & Date): <br /> <br />885MMP 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.