Laserfiche WebLink
DI~,FT (August 7, 1990) <br /> <br />Possible walcr erosion during construction shall be mitigated by thc installation of <br />temporary erosion control dm'icm by the project applicant, as required by the State <br />Regional Water Ouality Control Board. <br /> <br />~Timin_e of Implementation/Verification: Prior to grading permit issuance and during <br /> grading operation <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Res_r~nsible Part~. <br /> <br />Verification (Name & Date): <br /> <br />Sr. Plan Check Engineer, Budding Division <br /> <br />77:L <br /> <br />Utilization of desiltation devices such as sandbags in areas that may discharge into <br />city streets shall be implemented by the project applicant prior to the commencement <br /> <br />of grading activities. <br /> <br />Timin_o of Implementation/Verification: <br /> <br />~Res~onsible Pan'v: <br /> <br />Vg:rification (Name a Date): <br /> <br />Prior to grading permit issuance <br /> <br />Grading plan check and field inspection <br /> <br />Sr. Plan Check Engin~r, Building Division <br /> <br />The grading plan prepared by thc applicant shall include a description of haul routes, <br />access points to the site, and a watering and sweeping program designed to minimize <br />impacts of haul operations. <br /> <br />Tirnin_e of ImplementationNerification: <br /> <br />Prior to approval of any grading permits <br />and implementation during grading phase <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Sr. Plan Check Enginerr, Building DMsion <br /> <br />Verification (Name & Date): <br /> <br />885MMP 2 <br /> <br /> <br />