My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2149
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1991 (NS-2105 - NS-2152)
>
NS-2149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:03:12 PM
Creation date
6/26/2003 10:08:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2149
Date
10/21/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />113 <br /> <br />l <br />vi <br /> <br />TRANSPORTATION DEMAND MANAGEMENT <br />MITIGATION MEASURES FOR XEROX CENTRE <br /> <br />The following Transportation Demand Management (TDM) <br />measures are bound by conditions included in the Covenants, <br />and Restrictions (CC&R's) for Xerox Centre, <br /> <br />mitigation <br />Conditions <br /> <br />1. A Transportation Demand Management (TDM) program(s) shall be <br />developed for each phase or combinations of phases, This shall <br />hereinafter be referred to as the Xerox Centre TDM Program(s), <br />The Xerox Centre TDM Program( s) shall commence with the occupancy <br />of the next building de,veloped at the project. The Xerox Centre <br />TDM Program(s) shall be required to adhere to TDM mitigation <br />measures that are consistent with, and no more burdensome than, <br />requirements of similar projects under the jurisdiction of. the City <br />of Santa Ana. <br /> <br />2. The TDM program( s) shall be designed and Implemented to ensure <br />that traffic generated by each phase of the revised master plan c10es <br />not exceed the following AM peak hour vehicle trips at the completion <br />of that particular phase: Phase I only--414; Phases I & II -- 827; <br />Phase III only -- 257, The numbers of vehicle trips required to <br />reduce AM peak hour traffic by 15% Il.re identified in the attached <br />Table 2 from the Traffic Impact AnalysiF< and Site Plan Review by <br />DKS Associates dated August. 1991. Phase I is bllilt and therefore <br />the reduction from 487 to 414 AM peak hour trips (Il net reduction of <br />73) is considered fixed. Inasmuch as Phases II and lor III are not <br />yet permitted, the actual square footages are subject to change, <br />Should the gross square footage of these remainin'g phases change in <br />final design, the TDM threshold values shall be adjusted using the <br />ITE Trip Generation Rate Data in Table 2, <br /> <br />3. Adherence to the TDM Program( s) will be determined by the <br />Owner( s) conducting annual traffic counts at the driveways of Xerox <br />Centre (South Driveway for Phases I and II, and the North Driveway <br />for Phase III). The AM peak hour shall be defined as the hour <br />between 6:00 a,m, to 10:00 a,m. during which the highest vehicular <br />voiumes on the adjacent street system are recorded, Vehicles <br />entering and leaving project during the AM peak period (I.e" 6:00 to <br />10: 00 a, m,) will be counted on Tuesday, Wednesday. and Thursday <br />for two consecutive weeks during the period of January 15 through <br />May 20 or September 20 through November 20, The average peak <br />hour total vehicular volume will be calculated and serve as the basis <br />for the evaluation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.