Laserfiche WebLink
was ordered filed, read, considered, designated <br />Resolution Df Award No. 1125 and passed by the <br />following vote: <br /> <br />Ayes: <br /> <br />Noes: <br /> <br />Absent: <br /> <br />~rustees C.H.Ohapman, Geo. McPhee', <br />Nat H. Neff, C.L.Killen, J.W.Tubbs. <br /> <br />Tr~stees None. <br /> <br />Trustees None. <br /> <br />~n Re <br /> <br />Resolution of Award <br /> <br />No. 1129 - Wilshire - <br /> <br /> Borcha~d, etc. <br /> <br /> Item 1 <br /> <br />B. R. Ford .29-$/S or .lg-5/8 <br />0glesby & Datul .215 <br />¥~ells & Bressler .198 <br /> <br />Item <br /> <br /> 50 <br /> <br />This being the time and place fixed for the opening <br /> <br />bids or proposals for the work ordered done and <br /> <br />improvement oDdered made upon and ~ong p~tions of <br /> <br />those open public streets in the c~ty of Santa Aha <br /> <br />commonly known as Wilshire Avenue, Borchard Ave., <br /> <br /> ~ Ross <br />S. Sycam~e St., S. Broadway, S. Birch St., ~. <br /> <br /> ~' Van Ness Ave., S.Parton St. and S. Garnsey St <br />St., ~. <br /> <br />briefl~described in Resolution of Intention. No. <br /> <br />109~ and ordered done in Resol~ ion No.ll~ , and the <br /> <br />Board of Trustees being duly convened in open session <br /> <br />proceeded to and ~ d publicly open, examine and <br /> <br />declare all bids received: Bids were received as <br /> <br />follows: <br /> <br /> Item 1.~ '~¥e regrsding to a subpgrade and th~ layin <br />of five (S) inch concrete pavement with belt finish <br />wear~nE surface complete w~th the furnishing of all <br />necessary equipment, labor and mater~al on au estimat <br />of ~29,~88 square fee~. <br /> <br /> Item 2. ~he construction of concrete curb complete <br />with the furnishing of all necessary equipment, labor <br />and material on au estimate of 80~.2 linear feet. <br /> <br /> Item 3. The trenching, furnishing and laying of <br />six (~) inch nmin sewer pipe in eccordauce with plans <br />and specifications complete with the furni~Ting of <br />all necossary equipment, l~bor and material on an <br />estimate of 1014 linear feet. <br /> <br /> Item 4. The trenching,.furnishing and laying of <br />forty (40) four (4) inch house braneh connecting <br />sewers from the main sewer to and inside of the curb <br />line complete with the furnishing of all necessary <br />equipment, labor and material on an estimate of <br />~5Oline~r feet. <br /> <br /> Item'5. ~l~e excavation for and the coustructlon o~ <br />two (2) n~nholes as shown on plans complete ~th the <br />furnishing of all necessar~ equipment, labor and <br />material._ <br /> <br /> Ite~ 6.- The excavation for and the constructlon <br />one (1) flush tank as shown ou plans complete with <br />the furnishing of all necessary equipment, labor and <br />material. <br /> <br />Item 8 Item 4 Item 5 Item 8 Total <br /> <br /> vp/ 5o/ $9s. $1o , gv.5 <br /> V5 50 VS. 110. 116,4~?.12 <br /> 7~ 50 90. 120. 10~,~90.50 <br /> <br />The Board of Trustees thereupon rejected all bids <br /> <br />except the bid hereinafter mentioned and awarded <br /> <br />the contract to Wells ~ BrSssler for the work or <br /> <br />improvement as the lowest responsible bidder therefo~ <br />at tbs Frice r~amed in their bid. <br /> <br />Trustee Neff th~n ~rtroduced a resolution award- <br /> <br />lng the contract to ~.ells ~ Bressler. The <br /> <br /> <br />