Laserfiche WebLink
In Re <br />Resolution of Aw~'x"'d I~o.1141 <br /> <br />Flower Street. <br /> <br />~ells & B~esller <br /> <br />Oglesby & Dahl <br />B. R. Fo~d <br /> <br />Xte~a 1 Item 2 Item 3 <br /> .241 2.00 1.25 <br /> .23-3/8 2.00 1.~ <br /> 2.15 i.ss <br /> <br />This being the time and place fixed for the openin <br />of bid~ or proposals for the work ordered done and <br /> <br />improvement ordered made upon and along that po~- <br />tics of S. Flower Street lying betweem the South <br /> <br />line of Fai r~iew Avenue and the So,th line of <br /> <br />Edinger ~treet , briefly described in Hesolution <br /> <br />of Intention No. 1110 and ordered done in Resol~- <br />tics No.llIVand the Boa~d of T~ustee! ~eing duly <br /> <br />convened in open lellion p~oeeded to and did- <br /> <br />publicly open, examine an~ deola~.all bids recei. <br />~ids were ~eeeived as foll~ws: <br /> <br /> Item 1. 'A~e ~egr~ding to a subGg~de and the <br />laying of a six inch concrete pavement with belt <br />finish wearing surface, complete with the <br />furnishi~ of all neoessa~ equipment, labo~ and <br />material on an eltimete of 9~,522 Iqua~e feet. <br /> <br /> Item 2. ~he oonltruotion of concrete combina- <br />tion curb and gutter ~8 feet; complete with the <br />furnishing of all neoeeea~ equipment, labor md <br />material, according to plans and specifioatrions <br />on an estimate of 184V.83 linear feet. <br /> <br /> item 3. The construction of eo~e~ete e~elal <br />gutter (5 feet) wide oe~Plete with Sbe fu~l~hing <br />of all neoeesal-yequipment, labor and mater~ 1 <br />according to plans and specifications on ,an esti- <br />mate of 605.50 linea~ feet. <br /> <br /> Item 4. 'A~e COnltmetion of standard concrete <br />curb ccm,~lete with the furnishing of all neoessar <br />equi~men~,a~d mat®~ial on an estimate of 1128.40 <br />linear feet. <br /> <br /> Item 8. 'Al~e construoti~ of s special twenty- <br />f~ inch curb complete with furnishing of all <br />~eoesear~ equipment, labor and material ac~ rding <br />to plans and speciffications on an estimate of <br />~0.~0 linear feet. <br /> <br /> Item ~. 'Ab emoavatten of t~en~happ~oxi~at~ly <br />six feet deep and the laying the~eimof, six (6) <br />inch main sewer pipe in accordance with the plans <br />and s~eoifieations c~mplete with ~he furnishing of <br />all necessar~ equipment, labor and ~aterial. <br /> <br /> Item ?. The tr~ehiug, furnilhing and laying of <br />forty-two (42) fo~r (4) inch hOUle b~anch sewers <br />from the main sewer to the curb line complete with <br />furnishing of all necessary equipment~ labor and <br />material, on an estimate of 8~ linear feet. <br /> <br /> Item 8. ~e exeavatio~ for and the eonst~u~tio~ <br />of two (2~ mamholee in accordance with plans and <br />speoiffieatione with ~ fu~ishing of the neeessa~ <br />equipment, labor sr~ ~e~Aal. <br /> <br /> Xt~m g. The e~avetion for and the construction <br /> of one (1) ~lUlh 'Pank in accordance with plans and <br /> s~eclfieations oo~plete wi~h all necessary equipme <br /> labor and <br />Item · Item 5 Item <br />.~0 1.00 .75 .~0 $100. $120. <br />.50 .~0 ,~0 .50 63. 100. <br />· 50 .?0 .65 .43 65. 90. <br /> <br />The Board'~fTrustees thereupon ~eJected all bide <br /> <br />except ~he bid he~el~aafte~ nmntione~, and awarded <br /> <br />the c ont~aet to Oglelb~ and ~hl fo~ the work <br /> <br />i~provement, as the lowest ~esnplible bidder the~ <br /> <br />for, at the price named in tt~eir bid. <br /> <br />T~ustee N~ff then intrndu~ed a ~elolution awal~ <br /> <br />in~ the cost,eot to Oglesb~ and D~hl. The <br /> <br />~elolutio~ ne ordered filed, read, oonsldered, <br /> <br /> <br />