Laserfiche WebLink
In He <br /> <br />Bids for Water Pipe. <br /> <br /> In Re <br /> <br />· Bids <br /> <br /> South Main St. <br /> <br />Bidder <br /> <br />Wells & Bressler <br /> <br />T. W. Oglesby <br /> <br />item 1 <br />.24 <br /> <br />Item 2 <br /> <br /> 5o6 <br /> <br />.089 <br /> <br />On motion of Trustee Chapman, seconded by Greenleaf ar <br /> <br />carried, the Water Supe ri~teddent was instructed to <br /> <br />furnish Clerk with data for advertising for 1000 tons <br /> <br />of water pipe, bids to be opened April 2nd. <br /> <br />This being the time and rlace fixed for the openin~ of <br /> <br />bids 6r proposals for the work ordered done and im- <br /> <br />provement made as per re-advertisement, upon a~d alon <br /> <br />a portion of that open public street in the city of S <br /> <br />Santa Aaa commonly known as South Main Street, brlefl <br /> <br />described in Resolution of Intention No. 927 add <br /> <br />ordered done in resolution No. 946, and the Board of <br /> <br />Trustees being duly convened in open session proceed, <br /> <br />to and did publicly open, examine and declare all bid: <br /> <br />received. Bids were received as follows: <br /> <br />I~em 1. 'i~e regrading to a subgrade and the layLng <br />of a six (6) inch concrete pavement with belt finish <br />wearing surface, complete with the furnishing of all <br />necessary equipment and material on an estimate of <br />14,954.5 square feet. <br /> <br />ltem 2. The construction of concrete curb complete <br />with furnishing of all necessary equipment and ma~erii <br /> on an estim~te of 140.56 linear feet. <br /> <br />Item 3. The construction of concrete combination curb <br />and gutter comrlete with the furnishing of ~11 necess- <br />ary equipment an~ material, according to plans and <br />specifications, on an estimate of 10~8.80 linear feet. <br /> <br />Item 4. The trenching, furnishin~ and laying of eight <br />(8) inch main sewer complete with the ~urnlshing of <br />all the necessary equipment ~nd material, and the back <br />filling and settling of trench on an estimate of 1050 <br />linear feet. <br /> <br />Item 5. The trenching, furnishing and. laying of three <br />(Z) six (~) inch stub end main sewers comrlete with <br />furnishing of all the necessary equipment sad material <br />and the backfilling of trench on an estimate of ~0 <br />linear feet. <br /> <br />Item 6. The trenching, furnishing and laying of four- <br />teen (14) four (4) inch house branch sewers from the <br />main sewer to the curb line complete with furnishing <br />of all necessary equipment and material on an estimate <br />of 154 linear feet. <br /> <br />Item ?. The excavati~m for and the construction of <br />three (3) concrete manholes, as shown on plans and <br />specifications, complete with the furnlshi~g of all <br />necessary equipment, labor sad matert~l. <br /> <br />Item 8. The excavation for and the construction of om <br />(1) flush tank, as shown on p]~ns, com~!ete with the <br />furnishing_ of nil necessary equipment, labor and <br />ma teria 1. <br /> <br />Item S Item 4 Item 5 Item 6 Item V item 8 <br /> <br />1.50 1.30 1.20 1.10 $80. $135. <br /> <br />1.95 1.10 .95 .65 ~85. $125. <br /> <br />The Board of Trustees thereupon rejected all bids ex- <br /> <br />cept the bid hereinafter mentioned and awarded the <br /> <br />contract to T. ~. Oglesby for the work or improvement <br /> <br />as the lowest responsible bidder therefor ~t the price <br /> <br />named in his bid. <br /> <br />Trustee '.,.L.Creenleaf t~en i~troduced a <br /> <br />resolution awarding the contract to T. ~'i. Oglesby. <br /> <br /> <br />