Laserfiche WebLink
,2O4 <br /> <br />In Re <br /> <br />N. Artesia, W. 9th, Hickey, <br /> <br />N. Baker, W. Washington <br /> <br />and N. Flower <br />Bids <br /> <br />resolution passed by the followin~ vote: <br /> <br />Bidder Item i <br /> <br />Ayes: Trustees 3.b.Tubbs, C.H. Chapman, <br /> H.H.Da!e, ?.a. Green!eaf, John G.Mitche] <br /> <br />Noes: Trustees None. <br /> <br />Absent: Trustees None. <br /> <br />Joe Chutuk .V0 <br />Cox & Teget 1~05 <br />H.D.Churchill Co.1.30 <br />Leo Militch 2.50 <br />B.D.Zoich 1.02 <br />Pernel Barnett 1.03 <br />Nick BeBeb 1.14 <br />Budincich & <br />Nikcerich 1.26 <br />C.E.Green 1.50 <br /> <br />~"nis belug the time and place fixed for the opening <br /> <br />of bids or proposals for the work ordered done and <br /> <br />improvement ordered made upon and along a portion o~ <br /> <br />those open public streets in the city of Santa Aha, <br /> <br />briefly described in Resolution of Intention No.952 <br /> <br />and ordered d~ne in Resolution No. 970, and the <br />Board of Trustees being duly convened in open session <br />proceeded to and did nublicly open,examine and de- <br /> <br />clare all bids received. Bids were received as <br /> <br />follows: <br /> <br />I'em 1. The trenching, furnishing and laying <br />of ten (10) inch main sewer pipe in accordance <br />with Diana and specifications complete with <br />the furnishing of all necessary equipment, <br />labor and material on an estimate of 969 <br />linear feet. <br /> <br />Item 2. The trenching, furnishing and laying <br />of eight (8) inch main sewer pipe, in accord- <br />ance with rlans and specifications, complete <br />with the furnishing of ~ll'n~cessary equipmen~ <br />labor and material ~n an estimate of 8,040 <br />linear feet. <br /> <br />Item 3. The trenching, furnishing and laying <br />of six (6) inch main sewer pipe in accordmnce <br />w~th plans and specifications complete with <br />the furnishing of all necessary equipment~ <br />labor and ~ateri~ on an estimate of 4,~36 <br />linear feet.~ <br /> <br />Item 4. The excavation for and the construc- <br />tion of thirty-one (31) ms~oles as shown on <br />plans complete with the furnishing of all <br />necessary equipment, labor andmaterial. <br /> <br />Item 5. ~"he excavation for and the construe- <br />tion of six (~) flush tanks as shown on plans <br />complete'*ith the furnishing of all necessary <br />equipment, labor and material. <br /> <br />Item 2 Item 3 Item 4 Item 5 Total <br /> <br /> .vO .VO $V5.00 $100. 12,210.~ <br /> .88 .65 65.00 125. <br />1.11 1.00 11§.00 150. 18,911.1 <br />1.2V .85 60.00 100. 18,V43.9 <br />.85 .75 80.00 115. 14~189.? <br />.83 .V3 65.00 ., 110. 13,459.1 <br />.89 .V5 69~00 95. 14,169.0 <br />.92 .82 61.00 110o 14,667.* <br />1.30 1.25 80.00 150. 20,~10.~0 <br /> <br />of Trustees thereupon rejected all bids <br /> <br />The Board <br /> <br />except the bid hereinafter mentioned, and awarded <br /> <br />the contract to. Joe Chutuk for the work or improve- <br />ment as the lowest responsible bidder therefor at <br />the price named tu his bid. Trustee C.H.C~apman <br /> <br />then introduced a resolution awarding the contract <br /> <br />Joe Chutuk. The resolution was ordered filed, read <br /> <br />considered, and designated Resolution of Award No. <br /> <br />978; the rqll was called ~nd the resolution passed <br /> <br /> <br />