Laserfiche WebLink
In Re <br /> <br />Overflow water <br /> <br />9th & Artesia sra. <br /> <br />In Re <br />Overheating of <br />meter discs. <br /> <br />water <br /> <br />In Re <br /> <br />T~a ffic signal <br /> <br />let & Main <br /> <br />In Re <br />~tde~-PYp~.laying <br />an sewer farm. <br /> <br />Rerry#entges <br />Geo. ~ Fuerstenau <br /> <br />Item 1 <br /> <br />On motion of Trustee McPhee, a.~ocnded by Neff and <br /> <br />carried, the Chair was authorized to appoint a <br /> % <br /> <br />co~ittee to investigate matter of overflow water <br />from S. A. V. I. Co. lines in.vicinity of West 9th <br />and Artesia 5treats: Trustee McPhee, City Attorney <br />and City Engineer were appointed as such Committee. <br /> <br />f <br /> <br />On motion cf Trustee 0oll~r, seconded by McPhee <br />and carried, Water Superintendent and Plumbing <br />Inspector were instructed to have meeting with <br />examination bm rd of Master Plumbers and bring in <br />report and recommendation as to remedy for over- <br />hea~tng of water-meter discs. <br /> <br />On Motion of Trustee Neff, seconded by MoPhee and <br />carried, traffic signal at First & Main Streets was <br />ordered removed. <br /> <br />T~is being the time e~d place eat forth fca. o~ening <br /> <br />bids or proposals for the laying of irrigation pipe <br /> <br />on sewer farm, and the Board being now in ope n <br /> <br />session, proceeded to.open, examine and declare all <br /> <br />bids received, as followst <br /> <br />Item 1. The excavation of a trench of not less <br /> <br />than three (3) feet in depth and laying therein ~f <br />twelve (]2) inch concrete irrigation pipe (pipe to <br />be furnid~ed by the city of Sm ta Aaa, and delivered <br />to the sewer farm) and the backfilling of the same, <br />c~ replete with the furniehing of al 1 neeeaesry e~ ip- <br /> <br />men t, ~abor and material, on an estimate ~ four <br />thousand one hundred (4100) linear feet. <br /> <br /> Item ~. ~he inst~llstion of ~d the furnishing of <br />all fittings and mater~l equipment, and l~or <br />neceaear~ to construct eemplete in place the fclloei <br />sizes of standard stand .pipes: <br /> <br />(a) One stand pipe ten (10) feet h~h'haVing an <br />inside diameter ~ th~ty-Six (36) inches and <br />equipped with three twelve (12) inch ~ut off <br />gates, <br /> <br />(b) pne stand pipe six (6) feet high, having an <br />inane diameter of twent~ fo~ (~4~ inches and <br />equipped with one ~welve inch abut off gate and <br />ei~t and one-half inch fid# valve. <br /> <br />(~) One stand p!pe fou~ fee~ h~gh having an ineld <br />diameter of twenty four inches and e~iped with <br />two twelve inch sh~zt off gates. <br /> <br />Item 3. For the installation ef and the ffurn~ bin <br /> <br />of all fitting, materials, e~ipment end labor , <br />necessary to construct fourteen (1,1,)(more or ieee) <br />standard eight and one half inch ~D· val~e s. <br /> <br /> Item 2 Item <br />(a) ~S.O0 (~)t~.SO (c)t~O.O0 S9.00 <br /> 75.50 ~.50 4~ 00 61.00 <br /> 74~00 27.00 24.00 5.90 <br /> <br />On motion of Trustee Chaperon, seoonde~ by Neff and <br /> <br />oarr~ d, bide were referred to the Engineer for <br /> <br />checking. <br /> <br />~g <br /> <br /> <br />