My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1927
Clerk
>
Minutes
>
CITY COUNCIL
>
1886-1951
>
1927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:29:46 PM
Creation date
4/10/2003 10:24:29 AM
Metadata
Fields
Template:
Pre-Charter
Year
1927
Pre-Charter - Doc Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9¸6 <br /> <br />In Re <br /> <br />Petition <br /> <br />Paving Franklin <br /> <br />lot to Myrtle Streets. <br /> <br />In Re <br /> <br />Permit to <br /> <br />Install Gas Lines <br /> <br />W. Fourth Street. <br /> <br />In Re <br /> <br />Bids <br /> <br />Paving <br /> <br />Ouster, Logan <br /> <br />and Stafford Sts. <br /> <br />GPiffith Company <br />Steele Finley <br /> <br />Item 1 <br /> <br /> .18 <br /> <br />Item <br /> <br />.16 <br />.14 <br /> <br />Petition signed by property owners and representing <br />3V.~38~ was presented for the paving of Fran[:lin <br />Street from First to ~.:yrt]e Streets. On ~otion of <br />Trustee Goode,~econded by McBride and carried, the <br />petition was referred to the City Engineer for check. <br />lng and report back at next meeting. <br /> <br />II <br /> <br />On motion of Trustee Goode, seconded by Knox and car- <br />ried, the Southern Counties Cas Company ';,'ere ~iven <br />perRission, to install gas lines in parking on both <br />sides of W. Fourth Street from Ross to Bristol St~e~ <br /> <br />This being,. _ the time and· ·nlace set forth for the open. <br /> <br />lng of bids or proposals for the ps~ving and ot~erwis~ <br /> <br />improving of Custer, Logan and Stafford Streets, as <br /> <br />briefly described in R~solution of Intention ~;o. tV°~' <br /> <br />and the City Council being 5u!y convened in open <br /> <br />.... i~n, proceeded to open, examine and dec .... all <br /> <br /> ids iv d ~= follows: <br />b Fete e , <br /> <br />Item No. 1. !M~e ~radln~ to a subgrade and the ~a-~n~ <br />thereon of a five (5) inch asp}mltic ct'ncrete pave- <br />~ent, complete with the f~rnishing of all necessary <br />equipment, labor ~nd material for the sum of ~ <br />per square foot. <br />Item No. 2. ~e ~rading to a subgrade ~u~ t~e lay~n8 <br />thereon of a four (4) inch asphaltic concrete pave- <br />merit, complete .~zth the furnlsbing of ~]l necessary <br />equ!~ment, labor and mater~al fo~ the sum of '~ <br />per ~quare foot. <br />Item No. 3. The excavation for an~ t..e construction <br />of Portland Cement Concrete Curbs, complete ~ith the <br />furnz=hing of all necessary equipment, labor and <br />material for the sum of ~ per lin. ft. <br />Item No. 4. ~e excavati~ and the c:,nstruction <br />of Portland Cement Concrete sidewalks hcvfng a total <br />~hickness of three and one-half (3~) inches, complete <br />with the furnishing of all necessary equipment, labor <br />and m~terials for the su~ of ~ per square foot. <br />Item No. 5. The excavation for on,the construction <br />of Portland Cement concrete sidewalks h=v~ng a total <br />thickness of five (5) inches complete with the fur- <br />nis~Jng of all ~ecess~ry eq~iFment, labor and mote~ia] <br />for the sum of ~$ per square fo'ct. <br />Item No. 6. ~e~ching, furnishing an~ laying of <br />six (6) inch diameter main sewer comp!ere with the <br />furnishing of all necessary equipment, labor on~ <br />material for the sum of ~ per square foot. <br />Item NO. V. ~he trenchin~shing ann ~_~y:.ng of <br />four (4) inch diameter house connecting sewers, com- <br />plete with the furnishing of all necessary equipment, <br />labor and m~terial for the s~ of $ ~er lin.ft <br />Item No. 8. ~e excaw~tion for andre construction <br />of concrete sewer manholes com~t~ with the f-rn~sh- <br />lng of s%l necessary equipment,labor and materials <br />for the sum of .$ each. <br />Item No. 9. ~e excavation for and tRe construction <br />of concrete sewer manholes eqnipped with hand finisher <br />complete wi~h the D~mishing of all necessary equip- <br />ment labor ~nd motorist for the sum of a;,, ~ac]~. <br /> <br />Item 3 Item 4 Item 5 Item G Item V Item ~ Item 9 <br /> <br />.50 .15 .1V .V5 .60 100.0 <br /> ~ .16 ]8~ .90 .55 O0.O0 120.00 <br /> <br />On motion of Trustee Goode, seconded by ~,{cBride and <br /> <br />carried, bids were ~fe]~-a to the City Engineer for <br /> <br />checking to report back in one ~eek. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.