Laserfiche WebLink
ill <br /> <br />.[ <br /> <br />In Re <br /> <br />~lternate Bids <br /> <br />~ewer Work - Grand & Chestnut. <br /> <br />In Re // <br /> <br />Resolution of Award <br /> <br />No. 1~20 Main Street Lights <br /> <br />~hz~ ~efv~g the ~mr,,7 ma piece set for ~' ~ -~ <br /> <br />mate bids or proposals for the sewer u'ork and improve <br /> <br />meat upon Grand Avenue from Chestnut to Fourth amd <br /> <br />upon Chestnut Agenue from EcClay to the extension :~f <br /> <br />Grand Avenue, and the City Council being now in <br /> <br />sesszcn, proceeded to o~en, em~mzne and declare <br /> <br />bids received, as follows: <br /> <br />open <br /> <br />Item 1 Ite~ 1~ Item ~ ~tem 3 Item 4 <br /> <br />E. M. Funk 1.28 1.~0 80.00 80.00 ]~.00 <br />Pernel Barnett 1.20 t.10 65.00 95.00 5.00 <br />Lama ContractingCo 1.35 1.35 90.00 150.00 15.00 <br />Daniel Dokovich ].10 .~8 88.05 75.00 10.00 <br /> <br />On motion of Truste~ ~a~e,. seconded ]ry '~e..ly ~ ~.nd car <br /> <br />ried, all bids ~ere referred to the City Engineer for <br /> <br />checking to report back ~t this meeting. Follow~'~g <br /> <br />the report of the n~zneer, on ~'otion of Trustee Knox <br /> <br />seconded by }~{cBride ond carried, the bid cf Donie! <br /> <br />Dokevich in amount of ~$3,179.51 u~as accepted and vitr <br /> <br />fled cl~y pipe to be nsed in construction. The Clerk <br /> <br />was instructed to return certified checks and bends <br /> <br />of all unsuccessful bzdder~ <br /> <br />Roll Call: Ayes, <br /> <br /> }~oes, <br />Absent, <br /> <br />Trustees J.l..McBride, W.J.Ke_I~,' 1 ~ <br />W.C.Knox, Stanley E. Ooode, P.L. <br />Purinton. <br /> <br />~nustees None. <br /> <br />T~'mst ees None. <br /> <br />Thzs being tke tzme and pla ce towhich ac~zon on the <br />bide or propasats for the inatallsti0n bf ~n ornameu, <br />~at lighting system on N. ~ain street from First to <br />Sixt~ Street, as briefly ~escribed in Resolution of <br />Intention No. 180], was deferre~, and the City <br />being now in oDensessiou~ it was dete~mzne~ after <br />cbeeklng, that the bid of A. C. Rice was the lowest <br />bid .ubmztted. ~n motion of Trustee Knox, seconded <br />b~ Iie!ly and carried, contract for the in~tallation~ <br />of an ornamental lighting system on N. l~ain Street <br />from First to Sixth Stree. t, was awarded to A. C. Rice <br />st the total price of ~9252.00. The'?Gl~rk~was~i~stru <br /> <br />Item L~o. 1. ..~he trenchant, f~rnzs~zng and layin~ of <br />ten (10).~ncb diameter sa!t ~!azed ~mtrmfied <br />pipe main set, er e~q~t~.k .... with the furn~shi~ ~f all <br /> ' ~ labor r~nd materi~l for t~e sum <br />necessary equzpment, <br /> <br />Item No. la'. (Alternate) T~e tr~mcY~m.7, furnishing <br />a~d layirg of te~ (10) imch diameter c~mc~ete maim. <br /> :~th t~e fu~sh~m~ of all mecess?~ry <br />sewer complete · ' " ' <br />equipment, lo. bar ~>~? ~aterial for the s~ of ~ <br />per lin. ft. <br />Item No. S. ~e exc~t_o~ for ~od the construct~o~ <br />of c~crete ~e~holes complete with the furnishing of <br />all necessary equipment, labor and m~terial for the <br />sum of ~ each. <br />Item ~o.~e excavation for ~.~d the construction <br />of co,crete manholes ,~ith drof co~ections <br />with the fur~fsh!ug of all ~ ..... <br /> nece~:~z~ equipment, l~bo~ <br />and material for the sum of ~' each. <br />Item No. 4. The connectin~ o~istf.~g house <br />~ectzn, severers to the ~e~ lice com?lete with the fur- <br />nisbin~_ of ..~]1 necessary equipment, labor and r~a'~er <br />f?r the sum of .~ each. <br /> <br /> <br />