Laserfiche WebLink
ne~thtO and Connected with the manhol~ to be constructed <br /> at the point of intersection of the center line of North <br /> Artesia Street by the center line of West ninth Street <br /> produced from the east. <br /> <br /> The work and improvement which the Board of Trustees <br /> of the city of Santa Aha intends to order done and made in, <br /> on, and along West Ninth Street is briefly described as <br /> follows:- <br /> <br /> (a) The excavation for ~hd the construction of six <br /> (8) Concrete manholes and one (1) concrete syphon flush <br /> <br /> tank on approximately the cemter llne of ~est Ninth Street, <br /> one of said manholes to be ~2onstructed at each of the <br /> <br /> following places: <br /> <br /> One 489 feet, one 800 feet, one llO0 feet, one 1418 <br /> feet, one 1700 feet, and one 2000 feet east of the manhole <br /> to be constructed at the point of intersection of the <br /> center line of North Artesia &treet by the center line of <br /> West Ninth Street pr~,duced from the east. <br /> <br /> The concrete syphon flush ta~k to be constructed at a <br /> point ~SO0 fee~ e~st of the point of intersection of the <br /> center line of North Artesia Street by the center llne of <br /> West Ninth Street produced from the east. <br /> <br /> (b) The excavation along the center llne of West <br />Ninth Street of a main'sewer trench approximately 8 ft. <br />deep, and extending from the manhole to be constructed at <br />the point of intersection of the center llne of North <br />Artesia Street by the center line of West Ninth Street <br />produced from the east, east to the flush tank to be <br />constructed on the center line of West Ninth Street at a <br />potent ZZO0 feet east of the point of intersection of the <br />center line of ~est Ninth Street produced from the e~st by <br />the center line of North Artesia Street. <br /> <br /> The construction in <br />(8) inch inside diameter <br />main sewer pipe properly <br />constructed at the point <br /> <br />s~id main Sewer trench of an eight <br />vitrified salt glazed cylindrical <br />connected with the manhole to be <br />of intersection of the center line <br /> <br />a six (6) inch <br />col main sewer <br />be constructed <br /> <br />of West Ninth Street produced from the e~st by the center <br />line of North Artesia Street, and extending east to and <br />properly connected with the manhole to be constructed on the <br />center line of West Ninth Street 489 feet east of the point <br />of intersection of the center line of West Ninth Street <br />produced from the e~st by the center line of North Artesia <br />Street, also the construction in said main sewer trench of <br /> <br />inside diameter vitrified salt glazed cylindri <br />pipe properly connected with the manhole to <br />on the center line of. West Ninth Street at <br />a point 489 feet east of the manhole to be constructed at <br />the point of f~tersection of tl~e center line of North Artesia <br />Street, and extending east properly Connected with the man- <br /> <br /> <br />