Laserfiche WebLink
RESOLVED, that the said Board of Trustees ~ereby re- <br /> Jects all of said proposals or bids except that next herein <br /> mentioned, and hereby awards the contract for doing said work <br /> and improvement to the lowest responsible bidder, to-wit: <br /> <br /> T. $. Oglesby at the price named in his bid as follows, to-wit: <br /> <br /> Item 1. The grsding to a subgrade and the laying of <br /> six (8) inch concrete pavement cSmplete with the furnishing <br /> of all necessary equipment, labor and material ou an estimate <br /> of 128,~$4 squere fee~ for the sum of Eighteen cents ($0.18~ <br /> per square foot. <br /> <br /> Item 2. The grading to a subgrade and the laying <br /> cf five (~) inch concrete pavement complete with the ~urnish- <br /> lng cf all necessary equipment, labor and material on an es- <br /> timate cf 1~8,2V9 square feet for the sum of Twenty-one cents <br /> ($0.21) pe~ square foot. <br /> <br /> I~em ~. The construction of concrete sidewalk <br /> complete with the furnishing of al~ necessary equipment, <br /> bor ~ material on an estimate of ~2,45A square feet for the <br /> sum ef Fifteen cents ($0.1~ per square foot. <br /> <br /> Item 4. The construction of concrete curb complete <br />with the furnishing of all necessary equipment, labor and <br />material en an estimate of 1~,2~§ llnesr feet for the sum of <br />Forty-five cents ($0.48) per linear foot. <br /> <br />Item ~. The trenching, furnishing and laying of <br />eight (8) inch m~in sewer pipe in accordance w~th plsns and <br />specifications complete with the furnishing of all necessary <br />equipment, labor and material on an estimate of 1,V89 linear <br />feet for the s~n of Eighty-five cents ($0.88~ per linear foot. <br /> <br /> Item 8. The trenching, furnishing and laying of <br /> six (8) inch main sewer pipe in accordance with plans and <br /> epeeifications complete with the furnishing of all necessary <br /> equipment, labor and material on an estimate of ~,A~.84 lin- <br /> <br /> sum of Sixty-five cents ($0.88) per linear <br /> <br />ear feet for the <br />foot. <br /> <br /> Item V. <br /> <br /> The trenching,furnisHing end laying of <br />one hundred eight-eight (188) four (A) inch house lateral <br />connecting sewers from the main sewer to the curb line com- <br />plete with the furnishing of all necessary equipment, labor <br />and material on an estimate of 4,104.00 linear feet for <br />sum of Forty-five cents ($0.~5) per linear foot. <br /> <br /> Item 8. The excavation for and the construction <br />of eighteen (18) manholes ss shown on plans complete w~h <br />the furnishing of all necessary equipment, labor and material <br />for the sum of Sixty dollars ($$0.00~ each. <br /> <br />Item 9. The excavation for and the construction <br />of four (4) flush tanks ss shown on plans complete with the <br /> <br /> <br />