My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1925 (#1403-1607)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1925 (#1403-1607)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:48:05 PM
Creation date
4/16/2003 9:57:14 AM
Metadata
Fields
Template:
Pre-Charter
Year
1925
Pre-Charter - Doc Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ESOLUTION NO. 14~2. <br /> <br /> A R~ IUTION OF T~E BOAR~ OF ~RUSm~S OF THE CITY <br />SANTA ANA, CAI !FO.W~!IA, PROVIDING FOR A FOR~J O~ S~ECIF~C;~TZONS <br /> <br />AN~ A S~ANDARD SP~CTFICATION ~3R Ail POR~IANP C~.~mNT CONCRETE <br /> <br />~ASF mO p? T~emD TT~ AT! STRW~T "O.~E.. TN TW~ CITY OF SAlTy. ANA <br /> <br /> The ~o~r¢ of mrustees e¢ the City of Ssnt~ Aha do <br />resolve es <br /> <br /> SECTION I. ~¢t the fo~]s~!n~ set forth specifica- <br /> <br />tions shall be t~e ~tandard specifications for Portland Ce- <br />ment Concrete B~se, tv be used in ~]7 street w~rk in the City <br />of Santa ima, s~d shall be k~owo as "Standard Specification <br />No. 101", as fottowsw to-wit: <br /> <br /> SECTION 7. CURING. <br /> <br /> Within one (I) hour after laying the concrete base, it shall he covered with canvas <br />or burlap. This covering shall remain in place and be kept wet for a period of twenty- <br />four (24) hours. <br /> <br /> The entire surface of the concrete shall be thoroughly wet at least four (4) times <br />daily for twelve (12) days after laying. When directed by the Superintendent of Streets, <br />crossings shall be provided at street intersections. The number of crossings shall not <br />exceed one (1) to each alternate street intersecdon and shall bc constructed not less than <br />~eventy~two (?2) hours nor more ~chan ninety-six (96) hours after the pouring of the con- <br />crete. The crossing shall consist of covering the concrete with two (2) inch planks and <br />placing thereon at least six (6) inches of earth. <br /> <br /> After the base is completed, a period of twenty-one (21) days shall elapse before the <br />wearing surface is lald. <br /> <br />SEC?ION 8. UNIT PRICES. <br /> <br /> Unless the bidding proposal contains an independent item for Portland Cement Con- <br />crete Base course, the unit price per square foot as contained in the bidding proposal <br />for complete pavement including both the base course and the wearing surface shall be <br />the basis of payment, and shall be payment in full for both the base course and the <br />wearing surface complete in place, including all materials, labor, equipment, and other <br />incidental expense. <br /> <br />hereby certify that *~* foregoing <br />re~ui~rly ~sssed by tho Board of Trustees of <br /> <br /> at a regular meet~n~ tkereof held on the <br /> 192~, h~ t~ foil?win? vote: <br /> <br /> Trustees C.F. Chaymar:, <br /> F.L. Purimton <br /> <br />NO~S, mr~stees Non£ <br /> <br />Absent, Trustees J.W. Tubbs <br /> <br />~eso]ution was <br /> <br /> thc City <br /> <br />¢olller, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.