Item 3. The excavation for and the construction of <br />three and oneahalf (3~) inch cement concrete sidewalk complete <br />with the furnishing of all necessary equlpement, labor and ma- <br />terial on an estimate of 38,667.65 square feet for the sum of <br />Sixteen cents ($0.16) per square foot. <br /> <br /> Item 4. The excavation for and the construction of <br />five (8) inch Cement concrete sidewalk complete with the fur- <br />nishing of sll necessary equipment, labor and mster~sl on an <br />estimate of 2,267.50 squar~ feet for the sum of Twenty cents <br />($0.207 per square foot. <br /> <br /> Item 5. The trenching, furnishing and laying of <br />eight (8) inch Nain Sewer complete with the furnishing of all <br />necessary equipmmn~ labor and material on an estimate of <br />2,582.61 linear feet for the sum of Seventy-five cents ($0.70) <br />per linear foot. <br /> <br /> Item 6. The trenching, furnishing and laying of six <br />(6) inch main sewer complete with the furnishing of all neces- <br />sary equipment, labor and material on an estimate of 2,995.94 <br />linear feet for the sum of Sixty-five cents ($0.65) per linear <br />foot. <br /> <br /> Item 7. The trenching, furnishing and laying of <br />three hundred sixty-six (366) four (4)inch diameter house con- <br />nection sewer laterals complete with the furnishing of all <br />necessary eq~ipment, labor and material on an estimate of <br />6,474 linear feet for the sum of Forty-five cents ($0.45) lln- <br />ear feet for the sum of Forty-five cents ($0.45) per linear <br />foot. <br /> <br /> Item 8. The excavation for and the construction of <br />concrete sewer manholes complete with the l~rnishing of all <br />necessary equipment, labor and material on an estimate of 15 <br />momplete manholes for the sum of Sixty-five dollars ($65.00) <br />each. <br /> <br /> Item 9. The excavation and the construction of two <br />(2) concrete sewer flush tanks complete with the furnishing of <br />all necessary ecl~ipment, labor and material for the sum of One <br />Hundred Ten and no/100 dollars ($110.O0) each. <br /> <br /> Item 10. The excavation for and the reinforcing wit~ <br />Portland Cement Concrete of existing irrigating pipes under th~ <br />paved portion of the roadway complete with the furnishing of <br />all necessary equtpement, labor and material on an estimate of <br />152.28 linear feet for the sum of Two dollars ($2.00) per lin- <br />ear'foot. <br /> <br /> Item ll. The trenching, furnishing mnd laying of <br />four (4) inch diameter cast iron water pipe complete with the <br />furnishing of all necessary equipment, labor and material on <br />an estimate of 444.44 linear feet for the sum of One and 30/ <br />100 dollars (~1.30) per linear foot. <br /> <br /> <br />