My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1925 (#1403-1607)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1925 (#1403-1607)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:48:05 PM
Creation date
4/16/2003 9:57:14 AM
Metadata
Fields
Template:
Pre-Charter
Year
1925
Pre-Charter - Doc Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 8. The trenching, furnishing and laying of ten <br /> (10) inch diameter Nain Sewer, complete with the furnishing of al~ <br /> necessary equipment, labor and material for the sum of One dollar <br /> & ten cents ($1.10) per linear foot. <br /> <br /> Item 9. The trenching, furnishing and laying of four <br /> (4) inch diameter house connection sewer laterals, complete with <br /> the furnishing of all necessary equipment, labor and material for <br /> the sum of Sixty cents (~0.80) per linear foot. <br /> <br /> Item 10. The excavation for and the construction of con <br /> crete sewer manholee, complete with the furnishing of all necessa- <br /> ry equipment, labor and material for the sum of One hundred twenty <br /> five dollars ($128.00) each. <br /> <br /> Item ll. The excavation for and the construction of Co~ <br /> crete Sewer Flush tanks, complete with the furnishing of ~l neces <br /> sary equipment, labor and material for the sum of One Hundred Fort <br /> dollars ($140.00) each. <br /> <br /> Item 12. The excavation for and the construction of a <br /> culvert, shown on the plans as St~cture No. l, complete with the <br /> furnishing of all necessary equipment, labor and material for the <br /> s~nn of Two Hundred thirty,eight ~ 25/100 dollars ($2~8.2S) comp2et <br /> in place. <br /> <br /> Item l~. The excavation for and the construction of a <br /> culvert shown on the plans as Structure No. 2, complete with the <br /> furnishing of all necessary equipment, labor and material, for the <br /> sum of Seventy-two dollars ($72.00) complete in place. <br /> <br /> Item 14. The excavation for and the construction of a <br /> culvert shown on the plans as Structure No. 8, complete with the <br /> furnishing of all necessary equipment, labor and material for the <br /> sum of Three hundred seventy-eight & 50/100 dollars ($378.50) com- <br /> plete in place. <br /> <br /> Item 15. The excavation for ~nd the construction of a <br /> culvert shown on the plans as Structure No. 4, complete with the <br /> furnishing of all necessary equipment, labor and material for the <br /> sum of One Hundred elghty-ssven & 50/100 dollars ($18V.50) complet <br /> in place. <br /> <br /> Item 16. The excavation for and the construction of a <br />culvert shown on the plans as Structure No. ~, complete with the <br />furnishing of all necessary equipment, labor and material for the <br />sum of Sixty-seven & 80/100 dollars (~67.80) complete in place. <br /> <br /> Item l?. The excavation for and the construction of a <br />culvert and sand trap shown on the plans as Structure No. 6, com- <br />plete with the furnishing of all necessary equipment, labor and <br />material for the sum of One Hundred thirty-eight dollars ($138.00) <br />complete in place. <br /> <br /> Item 18. The excavation for and the construction of a <br />sand trap shown on the plans as Structure No. 7, complete with the <br />furnishing of all necessary equipment, labor and material for the <br />sum of Seventeen Dollars ($17.00) complete in place. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.