RESOLVED: That the said City Council hereby reject all of said proposals er
<br />bids except the next herein mentioned, and hereby awards the contract for doing said
<br />work and improvement to the lowest responsible bidder, to-wit: H. C. REID AND COMPANY
<br />at the prices named in their bid as follows, to-wit:
<br />
<br /> Item No. 1. The grading to a subgrade and the laying thereon of a Portland
<br />Cement Concrete pavement having a total thickness of six (6) inches, complete with the
<br />furnishing of all necessary equipment, labor and material for the sum of Twenty and
<br />one-half cents ($.208) per square foot.
<br />
<br /> Item No. 2. The excavation for and the construction of Portland cement
<br />concrete curbs, complete with the furnishi~n~ of all necessary equipment, labor and
<br />material for the sum of forty-eight cents (~.48) per linear foot.
<br />
<br />Item No. 3. The excavation for and the construction of Portland cement
<br />~oncrete sidewalks having a total thickness of four (4) inches, complete with the
<br />furnishing of all necessary equipment labor and material for the sum of Thirteen
<br />cents ($.13) per square foot. ' ~
<br />
<br /> Item No. 4. The excavation for and the construction of Portland cement
<br />concrete sidewalks having a total thickness cf five (5) inches, complete with the furn-
<br />ishing of all necessary equipment, labor and material for the sum of Fourteen cents
<br />($.14~ per square foot.
<br />
<br /> Item No. 8. The trenching, furnishing and relaying of existing sewer lateral
<br />complete with the furnishing of all necessary equipment, labor and material for the sun
<br />of Twenty Dollars ($20.00) each.
<br />
<br /> Item No. 6. The trenching, lowering and laying c~ fcttr (4) inch diameter
<br />vitrified clay pipe house connecting sewer extensions complete with the furnishing of
<br />all necessary equipment, labor and material for the sum of One Dollar ($1.00) per
<br />linear foot.
<br />
<br /> Item No. 7. The furnishing and installing of all necessary conduits, cables
<br />ground connections, making the necessary connections to the service point, the
<br />replacement or repair of all sidewalk, curb, paving, sewers, pipe lines, conduits,
<br />culverts, cut or damaged during construction~ complete with the furnishing cf all
<br />necessary equipment, labor and material for the sum of Six Thousand, five hu~dred
<br />eighty dollars ($6,880.00) complete.
<br />
<br /> Item No. 8. The furnishing, construction and installing of all necessary
<br />concrete foundations, anchor bolts, ornamental double light standards, wiring, lamps,
<br />globes and all other necessary items above ground, including the painting of standards
<br />and units, complete with the furnishing of all necessary equipment, labor and material
<br />for the sum of Ten Thousand, three hundred fifty dollars ($10,380.00) for all standards
<br />complete.
<br />
<br /> Item No. 9. The moving o2 two (2) existing double light standards to new
<br />loc%~tions shown on the plans together with the necessary replacement of concrete
<br />foundations, conduit, cable, and reinstallations of standards, complete with the furn-
<br />ishing cf all equipment, labor and material for the sum of One Hundred Dollars ($100.0~
<br />per standard complete.
<br />
<br /> Item No. 10. The excavation f~r and construction of railtop reinforced con-
<br />crete culvert according to detail f6F Culvert No. $ complete with the furnishing of all
<br />necessary equipment, labor and materzal for the sum of Twelve Hundred Dollars ($1,200.0
<br />complete.
<br />
<br /> Item No. ll. The excavation for and the construction of rail top reinforced
<br />concrete culvert extension according to details for Culvert No. 2, complete with the
<br />furnishing of all necessary equipment, labor and material for the sum of Three
<br />Hundred Dollars ($300.00) complete.
<br />
<br /> Item No. 12. The excavation for and the construction of reinforced concrete
<br />culvert according to details for Culvert No. 3, complete with the furnishing of all
<br />necessary equipment, labor and material for the sum of Three Hundred Dollars ($300.00)
<br />complete.
<br />
<br /> Item Ne. 13. The
<br />concrete culvert according
<br />ef all necessary equipment,
<br />($~00.00) complete.
<br />
<br />excavation for and the construction cf rail top reinforced
<br />to details for Culvert Nc. 4, complete with the furnishing
<br />labor and material for the sum of Five Hundred Dollars
<br />
<br /> Item No. 14. The excavation fer and construction cf rail top ~einforced
<br />concrete culvert extension according to details for Culvert Nc. 8, complete with the
<br />fttrnishing cf all necessary equipment, labor and material fo~ the sum of Three Hundred
<br />Dollars ($~00.00) complete.
<br />
<br /> Item No. $5. The excavation for and const~ction of reinforced concrete
<br />culvert according to de,ails for Culvert No. 6 complete with the furnishing of all
<br />necessary equipment, labor and material for the sum of One Hundred Twenty-five dollars
<br />($125.00) complete.
<br />
<br /> The Clerk of the City of Santa Ana is hereby directed to post a notice of
<br />this award conspicuously for five (8) days on or near the door of the Council Chamber
<br />of the City Council of the City of Santa Ana, and also publish said notice twice in
<br />the Santa Aha Daily E~ening Register, a daily newspaper published and circulated in
<br />the City of Santa Ana, and hereby designated for that purpose by said City Council.
<br />
<br /> I hereby certify that the foregoing Resolution is a full~ true and correct
<br />copy of Resolution of Award No. 2221, duly introduced and regularly passed by the City
<br />
<br />
<br />
|