My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-07-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Agenda Packet_2024-07-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 5:14:11 PM
Creation date
7/10/2024 4:43:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Date
7/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the needs of individual communities. Our understanding of public agency challenges and needs is what <br />makes Willdan unique. <br />Office Locations <br />Willdan has offices throughout the United States. Our California engineering offices are in the following <br />cities: <br />Z Anaheim Z Fresno Z Redding Z San Bernardino Temecula <br />�D Carlsbad Z Industry Z Roseville Z San Diego Ventura <br />Z Elk Grove Oakland Z Riverside Z San Francisco <br />Other Services <br />Willdan's experience in serving public agencies provides us with unmatched knowledge of the needs <br />and services required by City departments. As we serve directly in City offices, we are keenly aware of <br />how City CIP and design projects are planned, designed, and constructed. The services that we provide <br />to clients on a routine basis include Civil Engineering, Traffic Engineering, Survey/Mapping/ Right -of - <br />Way Engineering, Structural Engineering, Pavement Engineering, Stormwater Engineering, <br />Geotechnical Engineering, Landscape Architecture, Construction Management/Inspection, Utility <br />Coordination and Permitting, Environmental Compliance and Permitting, Grant Funding, and Labor <br />Compliance Management and Oversight. These are the core services that we provide daily to our clients <br />and are prepared to offer them to the City of Santa Ana. <br />Firm and Team Expertise: On -Call Contracts <br />On -call engineering services are Willdan's foundation. Our staff includes former public agency <br />employees or contract agency staff. Therefore, we understand the importance and purpose of on -call <br />contracts and are very familiar with the processes and procedures for such services. Within the last 8 <br />years, Willdan has completed projects and task orders for more than 200 as-needed/on-call contracts. <br />This experience and the relevant experience of our dedicated and available key personnel are what <br />best suits Willdan to provide the City with on -call services. <br />Our history of working with on -call contracts has prepared our staff to respond to all requests for services <br />in a positive, efficient manner. Our firm's commitment to responsive service and successful project <br />delivery has given us a reputation as a firm that can be trusted to listen to and <br />to deliver a product our clients envision and embrace. <br />We begin our approach by adhering to these principles: <br />ruthfulness <br />andhighathical <br />■ Conduct business with truthfulness and high ethical standards. standards 111111111111F <br />■ Approach each project with a spirit of resourcefulness and excellence. <br />■ Seek appropriate solutions that fit the project. <br />■ Maintain high standards of technical quality. <br />Maintain <br />solutions that fit highstandarda <br />Willdan understands the unique aspect of working under an on -call contract. i,:t eproi. <br />Success in working with this type of contract is dependent upon understanding 7 <br />a variety of elements that may be encountered, such as: <br />■ Short project durations and minimal lead times for assignments may be required. <br />■ Flexibility in service assignments, understanding work to date, and coordinating completion of <br />project tasks already started by agency staff in crucial projects. <br />■ The availability of our staff to the work assignment as it develops is critical to moving a project <br />forward. <br />■ Efficient use of resources is important for project assignments that are relatively small. <br />■ Consistent, organized project management is vital due to the potentially large numbers of projects <br />that may be in process. <br />City Council 15 — 22 roposa or un-Lall P <br />TN72M <br />ervices <br />
The URL can be used to link to this page
Your browser does not support the video tag.