Laserfiche WebLink
Page 119 <br />SCHEDULE <br />Below is an example of our schedule of deliverables for on -call engineering plan check projects. <br />ON 9 <br />CheckPlan .- JIV111111111JERWel <br />. -IF <br />First Submittal <br />WPI Hours <br />Subsequent <br />I <br />Estim�, <br />Conditions Of Approval <br />8 <br />2 <br />Traffic Impact Analysis (TIA) <br />6 <br />3 <br />Parcel/Tract Map <br />20 <br />8 <br />Water Quality Management Plan <br />8 <br />4 <br />Hydrology/ Hydraulics Report <br />12 <br />4 <br />Geotechnical Report <br />4 <br />1 <br />Rough Grading Plans <br />8 <br />4 <br />Street Plans <br />16 <br />8 <br />Precise Grading Plan <br />16 <br />8 <br />Storm Drain Plans <br />16 <br />8 <br />Water Plans <br />12 <br />4 <br />Sewer Plans <br />12 <br />4 <br />Street Light Plans <br />4 <br />2 <br />Signing And Striping Plans <br />8 <br />4 <br />Landscape Plans <br />8 <br />4 <br />Traffic Signal Plans <br />4 <br />2 <br />Retaining Wall Plans <br />4 <br />2 <br />SWPPP <br />8 <br />4 <br />Ito&Rq1u�,,rA,ro <br />foP <br />7e9 <br />Is for On -Call Engineering Plan Check Services <br />15-90 <br />7/1 <br />