My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-07-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Agenda Packet_2024-07-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 5:14:11 PM
Creation date
7/10/2024 4:43:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Date
7/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOTAL COST = $3,129.32 <br />8. To compensate the contractor for costs associated with the stay form for the New Anchor Wall <br />design due to the widening of the sidewalk. (PCO No. 09). <br />TOTAL COST = $35,000.00 z <br />9. To compensate the contractor for costs associated with chipping down the PCC Pence Footing <br />on the Southeast slope where the existing black wrought iron fence was placed. (PCO No. 11). <br />TOTAL COST = $6,459.83 1/ <br />10. To compensate the contractor for costs associated with placing additional gravel base due to <br />variable retaining curb height on Southwest and Southeast slopes. Compaction of slope also <br />had also to be redone. (PCO No. 12). <br />TOTAL. COST = $49,645.65 <br />11. To compensate the contractor for costs associated with removing the existing sidewalk and <br />installing a new 18" widened sidewalk. (PCO No. 13). <br />TOTAL EsTLMATED COST = $200,700.00 !` <br />12. To compensate the contractor for costs associated with repairing the v-ditch on the south slope. <br />(PCO No. 13.1). <br />TOTAL COST = $4,990.00 <br />13. To compensate the contractor for costs associated with removal and replacement of the curb & <br />gutter on the South side of the slope, removal of the existing asphalt -concrete section adjacent <br />to the curb & gutter, placement of asphalt -concrete slot patch, and to furnish and install three <br />No. 6 Pull Boxes. (PCO No. 14). <br />TOTAL. COST = $85,574.89 V <br />14. To compensate the contractor for costs associated with installation skate preventative devices <br />on both the North and South retaining curbs. (PCO No. 15). <br />TOTAL. COST = $49,174.00 <br />15. To compensate the contractor for costs associated with crack repair and re -staining of the blue <br />River Lens. (PCO No. 16). <br />TOTAL COST = $65,191.57 <br />16. To compensate the contractor for costs associated with installation of anti -graffiti coating on the <br />south anchor wall. (PCO No. 17). . <br />TOTAL COST = $10,800,00 <br />17. To compensate the contractor for costs associated with providing a smooth and uniform finish <br />to south anchor wall (PCO No. 18). <br />TOTAL COST = $11,250.00 <br />City Council page 2 of417 — 6 7/16/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.