Laserfiche WebLink
TECHNICAL • ' • Page 117 <br /> SECTION F I REFERENCES TECHNICAL SPECIFICATIONS FOR <br /> PROPOSED IMPROVEMENTS IN <br /> Please see Section E of the proposal for references CITY ROAD RIGHT OF W A Y <br /> for projects with public agencies. Due to the RFP L Road Structural Section components <br /> page limit constraint for additional references, the o Trench backfill and restoration <br /> City of Santa Ana can contact TKE for more <br /> information. o Storm Drain line and appurtenances <br /> o Traffic Signal components <br /> o Signing and Striping <br /> SECTION G I SCOPE OF SERVICES & WORKFLOW METHODOLOGY <br /> SCHEDULE <br /> Review for completeness of submittals <br /> SCOPE OF SERVICES Document submittal deficiencies and advise <br /> TKE's typical projected scope of services is the City as necessary <br /> presented in the following paragraphs: Identify any additional reference materials <br /> required for a thorough plan check such as <br /> D I G I T A L AND STANDARD P L A N related offsite improvement plans, studies or <br /> CHECKING SERVICES reports <br /> o Street and Storm Drain Improvements Conduct site visit as necessary <br /> o Grading, Erosion Control and/or Drainage Q U A L I T Y ASSURANCE / Q U A L I T Y <br /> Plans CONTROL <br /> L Construction Detour Plans TKE takes pride in its reputation for thoroughness, <br /> o Striping and Signing Plans rapid turnaround, cost efficiency and overall quality of <br /> L Traffic Signal Plans work, and believes that a high level of quality is <br /> o Water Improvement Plans needed on all service provided by TKE. Key <br /> L Sewer Improvement Plans components of the program include check lists, field <br /> o Street Lighting Plans reviews, and discussion with Client staff. High quality <br /> L Bridge or Retaining Wall Structures Not services yields the following tangible results: <br /> Under Building Permit Purview <br /> L Consistency with Other Planned o Ease of oversight <br /> Improvements o Smoother processing <br /> L Final and Parcel Maps o Minimal delays in the bidding phase <br /> o Easement Dedications o Healthy number of bidders <br /> L Vacations Quitclaims o Consistent bids <br /> o Lot Line Adjustments o Minimized construction support cost <br /> o Parcel Mergers o Absence of design-related change orders <br /> o Water Quality Management Plans o Reduced claims and dispute resolution costs <br /> PLAN CHECK SUBMITTAL ITEMS <br /> A N D REPORTS TKE believes that the most successful quality <br /> L Road Structural Section Components assurance program is one that is applied inherently <br /> o Hydrology and Hydraulic Calculations and throughout the entire process. This program requires <br /> Reports not only formal procedures for checking, but <br /> o Street Layout Design encourages the conscientious effort of experienced <br /> o WQMP's people to always "think quality" in every task <br /> o Structure Calculations Not Under Building performed throughout the design process. This <br /> Permit Purview program has become a natural element in all aspects <br /> o Traffic Reports or Studies of TKE's management activities, and will guide all <br /> o Quantity Estimates services provided by TKE. <br /> L Engineer's Cost Estimates Effective QA/QC includes: <br /> o Soils/Geological Reports <br /> o Compliance With Current NPDES Permits � Staff training and development <br /> o Assignment of experienced staff <br /> o Continuity of staffing <br /> o Project-specific work plan <br /> Schedule compliance <br /> Request for Proposals for On-Call Engineering Plan Check Services <br /> 111111HEiy-' OLA11 itil 15 — 88 7/16/202 <br />