Laserfiche WebLink
t' <br /> 2. Scope ofServicesi <br /> CAA proposes to perform all tasks associated with private development and <br /> engineering plan review. <br /> Services provided include: <br /> • CAA will provide Digital Plan Checking such as site visits and plan & map <br /> Services for Private Development Projects, preparations that do not fall under plan <br /> including grading, erosion control, streets, checks will be provided at an additional <br /> storm drain, sanitary sewers, reviewing and hourly rate. <br /> conditioning of land divisions and CAA will check general mathematics and <br /> development— residential, commercial, and design criteria, and call for redesign of any <br /> industrial plan checking; drainage and portion of plans that show poor engineering, <br /> hydraulics/hydrology reviews according to do not comply with the Approved Tentative <br /> applicable methodologies, lot line Ma or Conditions of Approval, <br /> adjustments, tract and parcel map reviews, pimpra might be <br /> water quality management plans, and potentially unsafe, or are impractical to build. <br /> assuring condition compliance. CAA will provide all the required <br /> CAA will review plan check submittal items correspondence on initial and subsequent <br /> • and reports, including road structural section reviews. Each plan review will be <br /> calculations; hydrology and hydraulic accompanied with a letter summarizing any <br /> calculations; street layout and design; red-fine comments. This letter can be <br /> structure calculations not under building addressed through the City Engineer, <br /> permit purview; traffic reports; and quantity assigned staff, or directly to the Designer, <br /> estimates as well as soil reports, grading, based upon the City's preference. A complete <br /> subdivision maps, erosion control, streets, redlined set of drawings and any reports will <br /> sewer, storm drain, traffic signal, street be returned to the designer for their <br /> lightning, retaining walls, and NPDES correction. Final approved documents and <br /> requirements. mylars with plan checker initials will be sent <br /> to the City at the end of the process. <br /> • CAA will ensure the completeness of submittals and document any deficiencies as CAA understands the importance of timely� reviews and the cost to the development <br /> needed. Our team will conduct site visits as community caused by delays attributed to <br /> necessary and interact with City personnel plan-check reviews, and pride ourselves on <br /> and private contractors to resolve any issues our ability to adhere to expected performance <br /> and answer any questions. CAA will review schedules at all times. CAA.will review and <br /> plans for sound engineering practices and return plans in less than 10 business days for <br /> provide detailed plan check of the assigned initial submittals for Moth small and larger <br /> project plans in accordance with applicable laws, standards, adopted codes and projects. Resubmittals will be reviewed within <br /> 5 business days or less. CAA.does not <br /> amendments. CAA will ensure accuracy of anticipate third submittals; however, should <br /> design in conformance with the City's most they occur, these will be reviewed within 5 <br /> current Plan Check Lists, and will provide and days or less. It is anticipated that submittals <br /> retain digital lists of corrections and redlines. will be digital. <br /> • CAA will perform other related engineering <br /> services as requested by the City. Services <br /> CAAprofessional government services 22 <br /> City Council 15 - 133 7/16/2024 <br />