|
Alyssa Kumnoonsate, PE
<br /> ASSISTANT ENGINEER II
<br /> Alyssa brings eight years of civil engineering expertise, with a strong focus on
<br /> plan checking. Her experience includes contributing to PS&E preparation for
<br /> public works projects such as roadway, storm drain, and sewer improvements.
<br /> Additionally, she has proficiency in creating temporary traffic control plans and
<br /> conducting hydrologic modeling. Alyssa is well-versed in local city and
<br /> county design standards and proficient in AutoCAD, Civil 3D, and Rational
<br /> Method Hydrology.
<br /> EDUCATION
<br /> RELEVANT EXPERIENCE BS, Civil Engineering
<br /> • City of Anaheim, On-Call Plan Checking Services. Plan Check Engineer.
<br /> Services under this contract include plan review for entitlement purposes, REGISTRATION
<br /> design plan check, standards implementation, hydrology and hydraulics Professional Civil
<br /> check, sewer capacity studies, street improvement plan check, dry utility Engineer, CA
<br /> (fiber and small cell installation) review, and grading plan check. The Harris
<br /> team evaluates the feasibility of proposed site development in order to assist CERTIFICATIONS
<br /> the City's land acquisition evaluation and due-diligence review. Alyssa's
<br /> responsibilities include serving as the case engineer for utility and development Adult First Aid/CPR/AED
<br /> plans, performing reviews, and preparing plan check comments. In the last five
<br /> years, the City has continued to rely on Harris' consulting services in-house
<br /> and to help develop processes for dry utility and development reviews.
<br /> • City of Anaheim, West Street and Broadway Alley Sanitary Sewer
<br /> Improvements. Project Engineer. Alyssa prepared the Preliminary Design
<br /> Report (PDR) for the project. When it was determined that a simple upsizing of
<br /> the sewers in West Street and Broadway Alley would not result in self-cleaning
<br /> velocities, Harris pivoted to new alternatives to maximize outcomes and deliver
<br /> high-quality results for the City.
<br /> • City of West Hollywood, Beverly Boulevard and Robertson Boulevard
<br /> Complete Street Project. Project Engineer. The project includes construction
<br /> of widened sidewalks, sidewalk bulb-out curb extensions with directional
<br /> access ramps at crosswalks, bike lanes, roadway paving, median islands,
<br /> intersection improvements, street tree planting, parkway planting using drought
<br /> tolerant groundcover, street lighting, and pedestrian level street lighting. The
<br /> project also includes reconfiguring the curb face to accommodate a new
<br /> development project and a gathering space. Street furniture and wayfinding
<br /> signage will be installed with this project. Alyssa supported the design team on
<br /> the design of curb ramps, storm drain relocations, utility disposition plans, and
<br /> street rehabilitation plans.
<br /> • City of Torrance, Pacific Coast Highway at Hawthorne Boulevard
<br /> Intersection Improvements. Project Engineer. The purpose of this project
<br /> was to enhance the intersection of Pacific Coast Highway and Hawthorne
<br /> Boulevard. The project widened and upgraded the intersection through
<br /> acquisition of right-of way, construction of dedicated right- and left-hand turn
<br /> pockets, re-striping, traffic signal modifications, and utility relocation, roadway,
<br /> drainage, traffic, and utility design. The scope also included obtaining a
<br /> Caltrans encroachment permit, coordinating right-of-way acquisitions (full and
<br /> partial takes), completing landscape irrigation improvements, and installing
<br /> retaining walls. Alyssa supported the design team on the design of curb ramps,
<br /> storm drain relocations, street reconstruction plans, and Caltrans PEER
<br /> encroachment permit.
<br /> City Council 15 — 177 7/16/2024
<br /> Harris&Associates, c.
<br />
|