My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-07-16 (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Agenda Packet_2024-07-16 (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 10:47:05 AM
Creation date
7/12/2024 10:31:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ali Shahzad, PE I KOA Corporation <br /> TRAFFIC PLAN CHECKER <br /> Ali Shahzad brings 27 years of experience with a strong working knowledge <br /> of traffic and civil engineering. His experience consists of project management <br /> and oversight from the concept to the design stage and through construction. <br /> His experience specifically includes engineering and traffic signal plan design, <br /> engineering and traffic surveys, traffic signal warrants, roadway striping and <br /> signage, safety studies, traffic control investigations, traffic calming, signal timing <br /> A <br /> and coordination, signal interconnect, traffic control plan design, and traffic <br /> impact studies. Ali is dedicated to utilizing his experience to find creative EDUCATION <br /> solutions while completing projects in a timely and cost-effective manner. BS, Civil Engineering <br /> RELEVANT EXPERIENCE REGISTRATION <br /> • City of Vista, Townsite Complete Street Improvements. Senior Engineer. Professional Civil <br /> KOA is providing Complete Street Improvements for the City of Vista. Project Engineer, CA <br /> locations are: 1) North Drive between Swallow Drive and W. Los Angeles <br /> Drive; 2) W. Los Angeles Drive between North Drive and N. Santa Fe Avenue; CERTIFICATIONS <br /> 3) Townsite Drive between N. Santa Fe Avenue and E. Vista Way; and 4) N. <br /> Santa Fe Avenue between Bobier Drive and California Avenue. The design Doppler Radar Speed <br /> includes sidewalks, ADA ramps, traffic circles (roundabouts), curb extensions, Survey Certified <br /> on-street parking spaces, bus stops, intersection lightings, stormwater facilities, <br /> bike lanes, green bike lane extensions through intersections, sharrow and AFFILIATIONS <br /> high visibility crosswalks, transit shelters, intersection lightings, traffic signal Member, Institute <br /> modifications, and mid-block pedestrian traffic signals. This project has been of Transportation <br /> funded with State and Federal funds from a Caltrans Active Transportation Engineers <br /> Program (ATP) grant, as well as local match funding. The environmental and <br /> design phases of the project are using State funds. However, the construction Former President, <br /> phase will be using Federal funds, and the project is required to follow the Institute Caltrans Local Assistance Program requirements for federally funded projects. Transportation <br /> Ali oversees QA/QC design plans and coordinates with city staff. Engineers - San Diego <br /> Section <br /> • City of Big Bear Lake, Moonridge Road Corridor Improvements Project. Former Chair, <br /> Senior Engineer. The Moonridge Corridor Improvement is the largest public SANDAG's SANTEC <br /> works project and stands as the most ambitious infrastructure venture in the <br /> City of Big Bear Lake's history. It revolutionized the Moonridge Road corridor <br /> as a complete street, serving motorists, bicyclists, and pedestrians, featuring a <br /> dog bone-shaped roundabout at one end and an oval one at the other. The dog <br /> bone roundabout is California's first of its kind. The project received the ACEC <br /> California Merit Engineering Excellence Award & the APWA B.E.S.T Award <br /> in 2024. <br /> • Town of Apple Valley, 2022 & 2023 Engineering and Traffic Surveys. <br /> Project Manager. KOA provided the Town with two Engineering and <br /> Traffic Speed Surveys (E&TS). The 2022 report presented the results and <br /> recommendations of an engineering and traffic survey for 16 roadway <br /> segments in the Town. A second report for 2023 provided an E&TS for an <br /> additional 48 segments. Both surveys were conducted in accordance with <br /> the California Vehicle Code (CVC) Section 627 and the CA MUTCD. The <br /> surveys were completed to be the basis for the establishment, revision, <br /> and enforcement of speed limits for several roadways. The services were <br /> requested so that posted speed limits could be updated or established to <br /> enable the Police Department and/or other law enforcement to use radar for <br /> speed enforcement. Ali oversaw the completion of two ETS reports totaling 70 <br /> segments_ He coordinated data collection and speed recommendations- <br /> Harris <br /> &AssociacitxcC'ouncil 15 — 184 7/16/2W4endix xviii <br />
The URL can be used to link to this page
Your browser does not support the video tag.