Laserfiche WebLink
etc.), response functionality, standard Library improvement plans will be logged into a plan check <br /> Comments. log. The plan check log (see Figure 1 on page 7) <br /> tracks the engineer of record, types of improvement <br /> • Reviewing prior comments to check if they've plans submitted, date submitted, due date to be <br /> been resolved. completed, and any significant comments or submittal <br /> • Resolving prior comments through the Review requirements outstanding for that plan review. Cannon <br /> Comments page. will provide regular updates (and as requested by the <br /> City) of the status of plan reviews to report progress <br /> • Using the Compare Files tool to compare and anticipated return dates of outstanding plan check <br /> resubmittals with prior submittals. projects. <br /> • Completing plan check reviews in the E-form As part of our project controls, Cannon will keep a <br /> window by changing Review Status to "Approved" record of when plans are received and returned in <br /> or"Corrections Required" and filling out the our plan check log. Excellent communications will <br /> Timesheet Log. allow us to define questionable areas, technical <br /> Already having experience with navigating and <br /> requirements, and to facilitate a smooth review and <br /> approval process. <br /> utilizing ProjectDox allows our plan check team to "hit <br /> the ground running" on performing plan check reviews Turnaround Time <br /> with zero learning curve. Figure 2 below is a sample <br /> of our on-line/electronic plan check comments. We take no exception to the turnaround time as <br /> outlined in the City's RFR If expedited reviews are <br /> Record Keeping and Reporting requested, we are open to having discussions with the <br /> Through years of experience, we have developed City and implementing these types of reviews. <br /> streamlined procedures that produce timely, <br /> accurate, and consistent plan reviews. Submitted <br /> Figure 2. Sample of On-line/Electronic Plan Check Comments <br /> 9- @- Mn°fafe- Review Measure Publish <br /> 003 Precise Grading Plan..pdf Vl <br /> ct;N8 T RVC11014 IV[YI'li5 LEC N1A <br /> A rsrrw.a•ruasQUANrirrrrraw <br /> KAD <br /> fo Ci Is d Englneeea 65urveyora <br /> s..�...,e.....,..s �� err— ..,,.. <br /> I� <br /> WAIW nvean>Q - <br /> �1 � PRBGI'SB GAAUING%AN amu w <br /> ♦ BANNTA NNA,.C cn & AV6N06 <br /> ® m A B2Poz xnC _n 9 <br /> i <br /> • 15 -226Cannon, 10 <br />