Laserfiche WebLink
Cannon provided on-call civil engineering plan <br /> CheckPlan - check and map check services on more than 100+ <br /> Lancaster, Califomia development projects for the City of Lancaster. As <br /> k Alf,A-ill"�- IIWIIIIIIIIIII part of our on-call contract with the City, Cannon <br /> reviewed grading and drainage plans, erosion control <br /> r plans, hydrology and hydraulic reports, storm drain <br /> improvement plans, street improvement plans, water <br /> improvement plans, sewer area studies, sewer <br /> improvement plans, landscaping and irrigation plans <br /> within a landscape maintenance district (LIVID), street <br /> light improvement plans and voltage drop calculations, <br /> soil/geotechnical reports, bond estimates, final <br /> � } c mapping, and other documents. <br /> ' Cannon's Plan Check Team reviewed the conditions <br /> Fees: $688,000 of approval, reference material, City standard plans, <br /> Project Dates: September 2016 - In Progress plan checklist requirements and accessibility for <br /> projects constructed in the City for conformance with <br /> Key Project Team - • - City Codes and ordinances, including the County <br /> • Gary Solsona, PE, QSD Senior • - - Grading Code and Manual, "Greenbook" Standard <br /> Senior• Jay Kanani, PE - - Specifications for Public Works Construction, County <br /> Yazd.Yazdani, PE SeniorChecker Standards and Design Manual, California Building <br /> QSD Grading/Hydrology/WQMPCodes, Los Angeles County Hydrology Manual and <br /> • . Diep, EIT Plan CheckerLos Angeles County Flood Control Hydraulic Design <br /> .. -c, EIT Grading/Street ImprovementManual. Extensive coordination was required between <br /> • •' Geotechnical Reviewthe different City departments and engineer of record <br /> Reference: Stephen Carillo, PE Senior Engineer to confirm quick turnaround times. <br /> City of Cannon provided reviews in Bluebeam Revu and <br /> 44933 Fern Avenue, Lancaster, CA 93534 transmitted plan check submittals using the City's <br /> 661.723.5845 ® scarrillo@cityoflancasterca.org Accela website. <br /> CheckCity of El Monte As-Needed <br /> Plan ServicesEl • • • • <br /> Cannon provided broad-based plan checking duties <br /> for the City of El Monte. Plan check services include <br /> grading, soils report reviews, storm drain, hydrology <br /> reports, LID reports, street improvement plans, parcel/ <br /> tract maps, condominium plans, easements, and lot <br /> — line adjustments. <br /> Key Project - Members <br /> • Gary Solsona, PE, QSD Senior Project Manager Fees: $220,460 <br /> • Jay Kanani, PE Senior Plan Checker Project Dates:October 2019 - In Progress <br /> PE SeniorChecker <br /> • Feldro Esperanza, PE Grading/Hydrology/WQMP Reference: Kevin Ko, PE Project Manager <br /> PE, • Grading/Hydrology/WQMP City of El Monte <br /> -. EIT Plan CheckerWest, - <br /> y Blvd. <br /> • Kaitlin Grabiec, EIT Grading/Street Improvement Plans El Monte, CA 91731 <br /> • •• Geotechnical Review626.580.2000 ® kko@elmonteca.gov <br /> JL <br /> • • 15 — <br />