My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-07-16 (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Agenda Packet_2024-07-16 (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 10:47:05 AM
Creation date
7/12/2024 10:31:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Painting and Wrought Iron Restoration at Santa Ana Regional Transportation Center <br /> July 16, 2024 <br /> Page 3 <br /> A total of seven bids were received and all were deemed responsive. AJ Fistes <br /> Corporation submitted the lowest responsive base bid in the amount of $719,100 <br /> (Exhibit 2). As specified in the bid documents, the lowest bid shall be determined on the <br /> basis of the base bid. Based on the bid analysis and a contractor's reference check, <br /> staff recommends awarding the construction contract to AJ Fistes Corporation in the <br /> amount of the base bid totaling $719,100 (Exhibit 3). This company specializes in <br /> general construction and painting services for Building Maintenance, Commercial Real <br /> Estate, and Construction. They have previously provided painting services at the <br /> Carnegie Navigation Center and hazardous material remediation at Fire Station #78. <br /> Project Delivery <br /> To deliver a complete project, in addition to the construction contract, the estimated total <br /> project delivery cost includes construction administration, inspection, and testing, along <br /> with an allowance for contingencies to account for unexpected or unforeseen <br /> conditions. Construction administration and inspection includes construction <br /> management and implementation of the labor requirements. <br /> As indicated in the Cost Analysis (Exhibit 4) and as summarized in the table below, the <br /> estimated total construction delivery cost of the project is $1,197,000. <br /> Project Item Total <br /> Construction Contract Bid Amount $ 719,100 <br /> Construction Administration, Inspection, Testing $ 107,865 <br /> Contract Contingencies $ 370,035 <br /> TOTAL ESTIMATED CONSTRUCTION DELIVERY COST $ 1,197,000 <br /> ENVIRONMENTAL IMPACT <br /> In accordance with the California Environmental Quality Act, the recommended actions <br /> are exempt from further review. Categorical Exemption Review No. ER-2024-43 was <br /> filed for the projects 24-6060 and 24-6061. <br /> FISCAL IMPACT <br /> As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br /> project is $1,197,000, which includes construction, contract administration, inspection, <br /> and testing, and authorized contingencies of$370,035. <br /> The proposed contract enables staff to authorize a construction cost increase of up to <br /> $370,035, if necessary for contingencies. Staff expects to utilize other available Public <br /> Works appropriations if a contingency becomes necessary to complete the project. If <br /> there are no other available appropriations, staff will return to City Council with a project <br /> update and recommendations. <br /> The funding of $1,475,000 for these projects was appropriated in prior fiscal years' <br /> capital budget. As part of the Citywide budget carry-forward process, the request will be <br /> City Council 21 — 3 7/16/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.