My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARRIS & ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
H
>
HARRIS & ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 10:44:13 AM
Creation date
7/25/2024 9:05:15 AM
Metadata
Fields
Template:
Contracts
Company Name
HARRIS & ASSOCIATES, INC.
Contract #
A-2024-099-04
Agency
Public Works
Council Approval Date
7/16/2024
Expiration Date
6/30/2027
Insurance Exp Date
8/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ali Shahzad, PE I :-BOA Corporation <br />TRAFFIC PLAN CHECKER <br />Ali Shahzad brings 27 years of experience with a strong working knowledge <br />of traffic and civil engineering. His experience consists of project management <br />and oversight from the concept to the design stage and through construction. <br />His experience specifically includes engineering and traffic signal plan design, <br />engineering and traffic surveys, traffic signal warrants, roadway striping and <br />signage, safety studies, traffic control investigations, traffic calming, signal timing <br />and coordination, signal interconnect, traffic control plan design, and traffic <br />impact studies. Ali is dedicated to utilizing his experience to find creative <br />solutions while completing projects in a timely and cost-effective manner. <br />1:7�R�9_\�i�77�I1rX.I� <br />City of Vista, Townsite Complete Street Improvements. Senior Engineer. <br />KOA is providing Complete Street Improvements for the City of Vista. Project <br />locations are: 1) North Drive between Swallow Drive and W. Los Angeles <br />Drive; 2) W. Los Angeles Drive between North Drive and N. Santa Fe Avenue; <br />3) Townsite Drive between N. Santa Fe Avenue and E. Vista Way; and 4) N. <br />Santa Fe Avenue between Bobier Drive and California Avenue. The design <br />includes sidewalks, ADA ramps, traffic circles (roundabouts), curb extensions, <br />on -street parking spaces, bus stops, intersection lightings, stormwater facilities, <br />bike lanes, green bike lane extensions through intersections, sharrow and <br />high visibility crosswalks, transit shelters, intersection lightings, traffic signal <br />modifications, and mid -block pedestrian traffic signals. This project has been <br />funded with State and Federal funds from a Caltrans Active Transportation <br />Program (ATP) grant, as well as local match funding. The environmental and <br />design phases of the project are using State funds. However, the construction <br />phase will be using Federal funds, and the project is required to follow the <br />Caltrans Local Assistance Program requirements for federally funded projects. <br />Ali oversees QA/QC design plans and coordinates with city staff. <br />City of Big Bear Lake, Moonridge Road Corridor Improvements Project. <br />Senior Engineer. The Moonridge Corridor Improvement is the largest public <br />works project and stands as the most ambitious infrastructure venture in the <br />City of Big Bear Lake's history. It revolutionized the Moonridge Road corridor <br />as a complete street, serving motorists, bicyclists, and pedestrians, featuring a <br />dog bone -shaped roundabout at one end and an oval one at the other. The dog <br />bone roundabout is California's first of its kind. The project received the ACEC <br />California Merit Engineering Excellence Award & the APWA B.E.S.T Award <br />in 2024. <br />Town of Apple Valley, 2022 & 2023 Engineering and Traffic Surveys. <br />Project Manager. KOA provided the Town with two Engineering and <br />Traffic Speed Surveys (E&TS). The 2022 report presented the results and <br />recommendations of an engineering and traffic survey for 16 roadway <br />segments in the Town. A second report for 2023 provided an E&TS for an <br />additional 48 segments. Both surveys were conducted in accordance with <br />the California Vehicle Code (CVC) Section 627 and the CA MUTCD. The <br />surveys were completed to be the basis for the establishment, revision, <br />and enforcement of speed limits for several roadways. The services were <br />requested so that posted speed limits could be updated or established to <br />enable the Police Department and/or other law enforcement to use radar for <br />speed enforcement. Ali oversaw the completion of two ETS reports totaling 70 <br />segments. He coordinated data collection and speed recommendations. <br />EDUCATION <br />BS, Civil Engineering <br />REGISTRATION <br />Professional Civil <br />Engineer, CA <br />CERTIFICATIONS <br />Doppler Radar Speed <br />Survey Certified <br />AFFILIATIONS <br />Member, Institute <br />of Transportation <br />Engineers <br />Former President, <br />Institute of <br />Transportation <br />Engineers - San Diego <br />Section <br />Former Chair, <br />SANDAG's SANTEC <br />Harris&Associates, Inc. Appendix 0 xviii <br />
The URL can be used to link to this page
Your browser does not support the video tag.