<br />REINFORCING STEEL AND PRESTRESSING STRANDS
<br />Reber tensile test, 5 up to No. 11 (ASTM A370)................................................70
<br />Rebar tensile test, i No. 14 & over (ASTM A370)...........................................215
<br />Reber bend test, up to No. 11(ASTMA370)......................................................70
<br />Rebar bend test, > No. 14 & over(ASTMA370)..............................................215
<br />Resistance butt -welded hoops/bars, tensile test, 5 up to Na 10 (CTM 670)....70
<br />Resistance butt -welded hoops/bars, tensile test, i No. 11 & over (CTM 670)...90
<br />Mechanical rebar splice, tensile test, s up to No. 11 (CTM 670).......................70
<br />Mechanical rebar splice, slip test, <C up to No. 11 (CTM 67o)............................45
<br />Mechanical rebar splice, tensile test,> No. 14 & over (CTM670)..................215
<br />Mechanical rebar splice, slip test, >- No. 14 & over (CTM 670).......................215
<br />Headed rebar splice, tensile test, s up to No. 11 (CTM 670)............................
<br />70
<br />Headed rebar splice, tensile test, >- No. 14 & over (CTM 670) .......................215
<br />Epoxy coated rebar/dowel film thickness (coating) test (ASTM A775IA934).......
<br />50
<br />Epoxy coated rebar/dowel continuity (Holiday) test (ASTM A7751A934).............
<br />70
<br />Epoxy coated rebar flexibilitylbend test, up to No. 11 (ASTMA7751034)..........
<br />50
<br />Prestressing wire, tension(ASTMA416).........................................................
<br />190
<br />Sample preparation (cutting).........................................................................
<br />55
<br />FEE SCHEDULE
<br />METHOD $/TEST
<br />STREET LIGHTS/SIGNALS
<br />LED Luminaires I Signal Modules I Countdown Pedestrian Signal Face
<br />Modules (Calnns RSS 86)........................................................................ 1,390
<br />SPRAY APPLIED FIREPROOFING
<br />Unit weight (density, ASTM E605).....................
<br />FASTENERS/BOLTS/RODS
<br />F3125 GR A307, A325 Bolts, tensile test, 5 up to 1-1/4" diameter, plain
<br />(ASTM A370).................................................................................................
<br />70
<br />F3125 GR A307, A325 Bolts, tensile test, 5 up to 1-1/4" diameter,
<br />galvanized (ASTMA370)...............................................................................80
<br />A490 Bolts, tensile test, <- up to 1-1/4" diameter, plain (ASTMA370)................
<br />70
<br />A490 Bolts, tensile test, 5 up to 1-1/4" diameter, galvanized (ASTMA370)......80
<br />A593 Bolts, tensile test, 5 up to 1-1/4" diameter, stainless steel (ASTMA370) ...
<br />70
<br />F1554 Bolts, tensile test, s up to 1-1/4" diameter, plain (ASTMA370)............
<br />110
<br />F1554 Bolts, tensile test, 5 up to 1-1/4" diameter, galvanized (ASTMA370)...
<br />130
<br />SAMPLETRANSPORT
<br />Pick-up & delivery (weekdays, per trip, <50 mile radius from Leighton office) ..110
<br />EQUIPMENT LIST
<br />ITEM
<br />$UNIT
<br />1/4 inch Grab plates................................................................................5
<br />each
<br />1/4 inch Tubing (bonded)....................................................................
<br />0.60 foot
<br />1/4 inch Tubing (single)......................................................................0.40
<br />foot
<br />318 inch Tubing, clear vinyl................................................................
<br />0.60 foot
<br />4-Gas meter (RKI Eagle or similar)/GEM 2000...................................
<br />140 day
<br />Air flow meter and purge pump (200 cc/min).........................................
<br />55 day
<br />Box of 24 soil drive -sample rings.........................................................
<br />130 box
<br />Brass sample tubes...............................................................................
<br />11 each
<br />Caution tape (1000-foot roll)..................................................................
<br />22 each
<br />Combination lock or padlock.................................................................
<br />15 each
<br />Compressed air tank and regulator.......................................................
<br />55 day
<br />Concrete coring machine (56-inch-dia)...............................................
<br />160 day
<br />Consumables (gloves, rope, soap, tape, etc.).......................................40
<br />day
<br />Coresample boxes.. .. .................................. _._ ........................
<br />.. . ...... 30 each
<br />Crack monitor Two-Dimensional............................................................
<br />30 each
<br />Crack monitor Thee-Dimensional..........................................................
<br />40 each
<br />Cutoff saws, reciprocating, electric(Sawzall®).....................................
<br />80 day
<br />D-Meter Walking Floor Profiler............................................................
<br />110 day
<br />Disposable bailers.................................................................................
<br />25 each
<br />Disposablebladders..............................................................................
<br />20 each
<br />Dissolved oxygen meter........................................................................
<br />50 day
<br />DOT 55-gallon containment drum with lid .............................................
<br />85 drum
<br />Double -ring infiltrometer......................................................................
<br />135 day
<br />Dual -stage interface probe....................................................................85
<br />day
<br />Dynamic Cone Penetrometer..............................................................430
<br />day
<br />Generator, portable gasoline fueled, 3,500 watts...............................-.90
<br />day
<br />Global Positioning System/Laser Range Finder ....................................
<br />80 day
<br />Handauger set......................................................................................90
<br />day
<br />HDPE safety fence (s100 feet).............................................................
<br />40 roll
<br />Horiba U-51 water quality meter ...................... ................................
<br />..-135 day
<br />Light tower (towable vertical mast) ......................................................
<br />150 day
<br />Magnehelicgauge.................................................................................
<br />15 day
<br />Manometer............................................................................................25
<br />day
<br />Mileage (will adjust with IRS published rate).......................................0.67
<br />mile
<br />Fee/2024
<br />ITEM
<br />$ UNIT
<br />Moisture test kit (excludes labor to perform test, ASTM E1907) .......
<br />..,. 65
<br />test
<br />Nuclear moisture and density gauge ....................................................
<br />88
<br />day
<br />Electrical moisture and density gauge ..................................................
<br />88
<br />Day
<br />Pachometer...........................................................................................
<br />50
<br />day
<br />Particulate Monitor...............................................................................
<br />135
<br />day
<br />pH/Conductivity/Temperature meter......................................................60
<br />day
<br />Photo -Ionization Detector(PID)....................................... ................. ...
<br />130
<br />day
<br />Pump, Typhoon 2 or 4 stage.................................................................
<br />55
<br />day
<br />QED bladder pump w/QED control box ...............................................
<br />175
<br />day
<br />Quire fee - Phase I only......................................................................
<br />250 each
<br />Resistivity field meter and pins............................................................
<br />200
<br />day
<br />Slip] threaded cap, 2-inch or 4-inch diameter, PVC Schedule 40.........
<br />20 each
<br />Slopeinclinometer...............................................................................
<br />250
<br />day
<br />Soil sampling T-handle(Encore)...........................................................
<br />10
<br />day
<br />Soil sampling tripod...............................................................................40
<br />day
<br />Speedy (R) moisture tester....................................................................10
<br />day
<br />Stainless steel bailer..............................................................................
<br />60
<br />day
<br />Submersible pump with controller.......................................................180
<br />day
<br />Submersible pump/transfer pump, 10-25 gpm......................................
<br />65
<br />day
<br />Support service truck usage (well installation, etc,) .............................
<br />250
<br />day
<br />Survey/fence stakes..............................................................................
<br />10 each
<br />Tedlai0bags,.-.., ............................... ............. ....................................
<br />25 each
<br />Traffic cones (525)/barricades (single lane) ..........................................
<br />55
<br />day
<br />Turbiditymeter......................................................................................
<br />80
<br />day
<br />Tyvek® suit (each).................................................................................
<br />25 each
<br />Vapor sampling box...............................................................................65
<br />day
<br />Vehicle usage (carrying equipment)......................................................20
<br />hour
<br />VelociCalc..............................................................................................
<br />40
<br />day
<br />Visqueen (20 x 100 feet).....................................................................
<br />130
<br />roll
<br />Water level indicator (electronic well sounder) <300 feet deep well....
<br />100
<br />day
<br />ZIPLEVEL®...........................................................................................
<br />40
<br />day
<br />Other specialized geotechnical and environmental testing and monitoring
<br />equipment are available, and priced per site
<br />www.leig htong ro up.com
<br />Page 3 of 4
<br />Harris&Associates, Inc. N vo
<br />
|