Laserfiche WebLink
/.Leighton <br />METHOD $[TEST <br />REINFORCING STEEL AND PRESTRESSING STRANDS <br />Reber tensile test, 5 up to No. 11 (ASTM A370)................................................70 <br />Rebar tensile test, i No. 14 & over (ASTM A370)...........................................215 <br />Reber bend test, up to No. 11(ASTMA370)......................................................70 <br />Rebar bend test, > No. 14 & over(ASTMA370)..............................................215 <br />Resistance butt -welded hoops/bars, tensile test, 5 up to Na 10 (CTM 670)....70 <br />Resistance butt -welded hoops/bars, tensile test, i No. 11 & over (CTM 670)...90 <br />Mechanical rebar splice, tensile test, s up to No. 11 (CTM 670).......................70 <br />Mechanical rebar splice, slip test, <C up to No. 11 (CTM 67o)............................45 <br />Mechanical rebar splice, tensile test,> No. 14 & over (CTM670)..................215 <br />Mechanical rebar splice, slip test, >- No. 14 & over (CTM 670).......................215 <br />Headed rebar splice, tensile test, s up to No. 11 (CTM 670)............................ <br />70 <br />Headed rebar splice, tensile test, >- No. 14 & over (CTM 670) .......................215 <br />Epoxy coated rebar/dowel film thickness (coating) test (ASTM A775IA934)....... <br />50 <br />Epoxy coated rebar/dowel continuity (Holiday) test (ASTM A7751A934)............. <br />70 <br />Epoxy coated rebar flexibilitylbend test, up to No. 11 (ASTMA7751034).......... <br />50 <br />Prestressing wire, tension(ASTMA416)......................................................... <br />190 <br />Sample preparation (cutting)......................................................................... <br />55 <br />FEE SCHEDULE <br />METHOD $/TEST <br />STREET LIGHTS/SIGNALS <br />LED Luminaires I Signal Modules I Countdown Pedestrian Signal Face <br />Modules (Calnns RSS 86)........................................................................ 1,390 <br />SPRAY APPLIED FIREPROOFING <br />Unit weight (density, ASTM E605)..................... <br />FASTENERS/BOLTS/RODS <br />F3125 GR A307, A325 Bolts, tensile test, 5 up to 1-1/4" diameter, plain <br />(ASTM A370)................................................................................................. <br />70 <br />F3125 GR A307, A325 Bolts, tensile test, 5 up to 1-1/4" diameter, <br />galvanized (ASTMA370)...............................................................................80 <br />A490 Bolts, tensile test, <- up to 1-1/4" diameter, plain (ASTMA370)................ <br />70 <br />A490 Bolts, tensile test, 5 up to 1-1/4" diameter, galvanized (ASTMA370)......80 <br />A593 Bolts, tensile test, 5 up to 1-1/4" diameter, stainless steel (ASTMA370) ... <br />70 <br />F1554 Bolts, tensile test, s up to 1-1/4" diameter, plain (ASTMA370)............ <br />110 <br />F1554 Bolts, tensile test, 5 up to 1-1/4" diameter, galvanized (ASTMA370)... <br />130 <br />SAMPLETRANSPORT <br />Pick-up & delivery (weekdays, per trip, <50 mile radius from Leighton office) ..110 <br />EQUIPMENT LIST <br />ITEM <br />$UNIT <br />1/4 inch Grab plates................................................................................5 <br />each <br />1/4 inch Tubing (bonded).................................................................... <br />0.60 foot <br />1/4 inch Tubing (single)......................................................................0.40 <br />foot <br />318 inch Tubing, clear vinyl................................................................ <br />0.60 foot <br />4-Gas meter (RKI Eagle or similar)/GEM 2000................................... <br />140 day <br />Air flow meter and purge pump (200 cc/min)......................................... <br />55 day <br />Box of 24 soil drive -sample rings......................................................... <br />130 box <br />Brass sample tubes............................................................................... <br />11 each <br />Caution tape (1000-foot roll).................................................................. <br />22 each <br />Combination lock or padlock................................................................. <br />15 each <br />Compressed air tank and regulator....................................................... <br />55 day <br />Concrete coring machine (56-inch-dia)............................................... <br />160 day <br />Consumables (gloves, rope, soap, tape, etc.).......................................40 <br />day <br />Coresample boxes.. .. .................................. _._ ........................ <br />.. . ...... 30 each <br />Crack monitor Two-Dimensional............................................................ <br />30 each <br />Crack monitor Thee-Dimensional.......................................................... <br />40 each <br />Cutoff saws, reciprocating, electric(Sawzall®)..................................... <br />80 day <br />D-Meter Walking Floor Profiler............................................................ <br />110 day <br />Disposable bailers................................................................................. <br />25 each <br />Disposablebladders.............................................................................. <br />20 each <br />Dissolved oxygen meter........................................................................ <br />50 day <br />DOT 55-gallon containment drum with lid ............................................. <br />85 drum <br />Double -ring infiltrometer...................................................................... <br />135 day <br />Dual -stage interface probe....................................................................85 <br />day <br />Dynamic Cone Penetrometer..............................................................430 <br />day <br />Generator, portable gasoline fueled, 3,500 watts...............................-.90 <br />day <br />Global Positioning System/Laser Range Finder .................................... <br />80 day <br />Handauger set......................................................................................90 <br />day <br />HDPE safety fence (s100 feet)............................................................. <br />40 roll <br />Horiba U-51 water quality meter ...................... ................................ <br />..-135 day <br />Light tower (towable vertical mast) ...................................................... <br />150 day <br />Magnehelicgauge................................................................................. <br />15 day <br />Manometer............................................................................................25 <br />day <br />Mileage (will adjust with IRS published rate).......................................0.67 <br />mile <br />Fee/2024 <br />ITEM <br />$ UNIT <br />Moisture test kit (excludes labor to perform test, ASTM E1907) ....... <br />..,. 65 <br />test <br />Nuclear moisture and density gauge .................................................... <br />88 <br />day <br />Electrical moisture and density gauge .................................................. <br />88 <br />Day <br />Pachometer........................................................................................... <br />50 <br />day <br />Particulate Monitor............................................................................... <br />135 <br />day <br />pH/Conductivity/Temperature meter......................................................60 <br />day <br />Photo -Ionization Detector(PID)....................................... ................. ... <br />130 <br />day <br />Pump, Typhoon 2 or 4 stage................................................................. <br />55 <br />day <br />QED bladder pump w/QED control box ............................................... <br />175 <br />day <br />Quire fee - Phase I only...................................................................... <br />250 each <br />Resistivity field meter and pins............................................................ <br />200 <br />day <br />Slip] threaded cap, 2-inch or 4-inch diameter, PVC Schedule 40......... <br />20 each <br />Slopeinclinometer............................................................................... <br />250 <br />day <br />Soil sampling T-handle(Encore)........................................................... <br />10 <br />day <br />Soil sampling tripod...............................................................................40 <br />day <br />Speedy (R) moisture tester....................................................................10 <br />day <br />Stainless steel bailer.............................................................................. <br />60 <br />day <br />Submersible pump with controller.......................................................180 <br />day <br />Submersible pump/transfer pump, 10-25 gpm...................................... <br />65 <br />day <br />Support service truck usage (well installation, etc,) ............................. <br />250 <br />day <br />Survey/fence stakes.............................................................................. <br />10 each <br />Tedlai0bags,.-.., ............................... ............. .................................... <br />25 each <br />Traffic cones (525)/barricades (single lane) .......................................... <br />55 <br />day <br />Turbiditymeter...................................................................................... <br />80 <br />day <br />Tyvek® suit (each)................................................................................. <br />25 each <br />Vapor sampling box...............................................................................65 <br />day <br />Vehicle usage (carrying equipment)......................................................20 <br />hour <br />VelociCalc.............................................................................................. <br />40 <br />day <br />Visqueen (20 x 100 feet)..................................................................... <br />130 <br />roll <br />Water level indicator (electronic well sounder) <300 feet deep well.... <br />100 <br />day <br />ZIPLEVEL®........................................................................................... <br />40 <br />day <br />Other specialized geotechnical and environmental testing and monitoring <br />equipment are available, and priced per site <br />www.leig htong ro up.com <br />Page 3 of 4 <br />Harris&Associates, Inc. N vo <br />