My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Traffic Signal Modification at Warner Avenue and Wright Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024
>
Item 19 - Traffic Signal Modification at Warner Avenue and Wright Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:43:22 AM
Creation date
7/31/2024 12:24:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
8/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 5 <br />PROJECT TITLE: <br />Active Transportation Safety <br />Improvements: Warner Avenue <br />Traffic Signal Modification <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Improvements <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This traffic safety improvements project will modify the traffic signal <br />at the intersection of Warner Avenue at Wright Street/Brookhollow <br />Drive to enhance the safety of motorists and pedestrians when <br />traversing this intersection. The improvement will separate the left <br />turning vehicle movement from pedestrians and bicyclists <br />eliminating the potential for conflict. These project improvements are <br />known to reduce vehicular and pedestrian involved collisions. <br />PROJECT NEED: <br />The Federal Highway Administration has identified Santa Ana has a <br />focus city due to its high number of documented pedestrian collision <br />history. In addition, the California Office of Traffic Safety ranks Santa <br />Ana high in pedestrian collisions compared to other California cities. <br />For the intersection of Warner Avenue at Wright Street/Brookhollow <br />Drive, City of Santa Ana Public Works Engineers completed a warrant <br />analysis in which it was determined by engineering judgement that the <br />existing conditions present safety concerns for both pedestrians and <br />motorists. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 468,750 - - - - - - <br />Engineering 37,500 - - <br />TOTAL 506,250 - - - - - - <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />CDBG Programs 506,250 - - - - - - <br />TOTAL 506,250 - - - - - - <br />DIVISION: <br />Traffic Engineering <br />CONTACT: <br />Zdenek Keku/a, Principal Civil Engineer <br />35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.