My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-08-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024 Regular & Special HA
>
Agenda Packet_2024-08-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:33:55 AM
Creation date
8/1/2024 10:22:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
8/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 24-050 <br />FLOW CONTROL VALVE MAINTENANCE PROGRAM <br />pilot system repairs and will vary depending upon the type of piloting system on each valve. <br />Assume that a full repair of the valve will include costs for replacement of all parts that could be <br />replaced in a standard Cla-Val diaphragm valve. <br />For bidding purposes, assume repair of the following components; replacement of disk and seat <br />on Cla-Val on the following models for various sizes as listed on the Fee Schedule: <br />1. Model90-01 <br />2. Model50-01 <br />3. Model52-03 <br />4. Model 61-02 <br />5. Model100-01 <br />The Contractor shall solely use Cla-Val parts for replacement, repair, and maintenance of all <br />components of the City's valves. <br />III. NEW VALVES AND PROCUREMENT SERVICES (BID ITEMS 10-11) <br />If the Contractor has determined rehabilitation of a valve system is not feasible or at the City's <br />direction, replacement of the valve with a new valve shall take place. Furthermore, if the cost to <br />repair the valve exceeds 50% of the cost to replace, replacement of the valve with a new valve <br />shall take precedence. When work includes the replacement of valves, the Contractor shall be <br />responsible for removal of the existing valve and installation of the new replacement valve. The <br />Contractor shall also be responsible for supply, installation, calibration and testing of the new <br />replacement valve. <br />IV. INSTRUMENTATION AND CONTROL SERVICES <br />The Contractor shall also have experience incorporating instrumentation and remote/local valve <br />control on existing and future valve components in the City. The City currently utilizes electronic <br />valve controllers (Model VC-22D), which serves as an interface between the City's SCADA <br />system, the valve, and other devices installed on or around the valve. The Contractor shall have <br />expertise in customizing the aforementioned valve controller with the Cla-Val trademarked <br />standard and customized ValvApps to meet the City's operational requirements specific to each <br />site. The Contractor shall be able to provide the following customization inputs and outputs for <br />the valve controllers upon City request: <br />1. Valve Regulation <br />2. Differential Pressure Monitoring <br />3. Retransmission <br />(1) Analog Inputs <br />(2) Digital Inputs <br />4. Solenoid Outputs <br />5. Relay Outputs <br />6. Actions/Alarms <br />7. Communication <br />C otg of Santa Ana RFP 74-n5n <br />City Council Flow Control Valve Maintenance arjMR.ehloilitation Services 8/6/2024 <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.