My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-08-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024 Regular & Special HA
>
Agenda Packet_2024-08-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:33:55 AM
Creation date
8/1/2024 10:22:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
8/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 24-050 <br />FLOW CONTROL VALVE MAINTENANCE PROGRAM <br />APPENDIX <br />ATTACHMENT 2: FEE PROPOSAL <br />Certification - I certify that I have read, understand and agree to the terms and conditions of this <br />Request for Proposals. I have examined the Scope of Services (Appendix: Attachment 1) and am <br />familiar with the scope of work. I am familiar with all the existing conditions and limitations that may <br />impact work requests. I understand and agree that I am responsible for reporting any errors, omissions <br />or discrepancies to the City for clarification prior to the submission of my proposal. <br />Proposer shall submit hourly rates schedule, which shall include but not limited to, direct and <br />indirect costs for labor, for staff per job classification, material, equipment rates, overhead, <br />incidental supplies, travel, mileage, and fuel. Any special materials will be purchased by the <br />contractor only after discussed and authorized by the City projects manager or designee in <br />writing. <br />Prior to commencement of services, Contractor shall provide separate quotes, upon request by <br />the City, which shall be approved by the City's Public Works Agency. <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: 94�swo l j lY►�-uSfri cs b 6A 041- Val <br />Bid Item <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />1. Labor 1 Man Prevailing Wage <br />HR <br />200 <br />$ ,3S ODO. 00 <br />2. Labor Men Prevailing Wage <br />HR <br />200 <br />$ LL/O.UU <br />�000.00 <br />3. Travel Per Day <br />EA <br />25 <br />$ 3y�.� <br />$0 <br />Model 50-01 <br />4. Repair 4" Pressure Control Valve Rubber <br />EA <br />20 <br />$ gas yy <br />///] <br />1 <br />$ , 6*0 g- go <br />i <br />Rebuilds for Main Valve and Pilot <br />- <br />5 Repair 6" Pressure Control Valve Rubber <br />EA <br />5 <br />$ tOS. AY <br />$2° 7/ -20 <br />Rebuilds for Main Valve and Pilot <br />6 Repair 8" Pressure Control Valve Rubber <br />EA <br />5 <br />c1 <br />$ 7�� <br />L�S <br />$9• �0 <br />Rebuilds for Main Valve and Pilot <br />7 Repair 10" Pressure Control Valve Rubber <br />EA <br />2 <br />,/ <br />$ 6d 0. LIP <br />$ fi-360 sO <br />Rebuilds for Main Valve and Pilot <br />8. Complete New 4" Model 50-01 1501b <br />Flanged/Epoxy Coated, Stainless Steel <br />Trim, Complete Stainless Steel Pilot 6 yFy Ov $ j bSd•0O <br />System, Opening &Closing Speed EA 20 $� I ag <br />Controls, Up Stream & Downstream <br />Pressure Gauges, X101 Valve Position <br />Indicator <br />City of Santa Ana RFP 24-050 <br />Flow Control Valve Maintenance and Rehabilitation Services <br />Page 20 <br />City Council 21 — 73 8/6/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.