My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-08-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024 Regular & Special HA
>
Agenda Packet_2024-08-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:33:55 AM
Creation date
8/1/2024 10:22:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
8/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 24-050 <br />FLOW CONTROL VALVE MAINTENANCE PROGRAM <br />Repair 12" Pressure Control Valve Rubber EA 5 $ / 63,%Z. $ 3� �17.'6O <br />19. Rebuilds for Main Valve and Pilot T— <br />Repair 14" Pressure Control Valve Rubber EA 2 $ 122.(0, ��r+ $ .�• <br />20. Rebuilds for Main Valve and Pilot —�— <br />21. Repair 16" Pressure Control Valve Rubber EA 2 <br />$ 1 292? 9-9 <br />$ s2IS /7 74 <br />Rebuilds for Main Valve and Pilot <br />22. Complete New 6" Model 90-01 1501b <br />Flanged/Epoxy Coated, Stainless Steel <br />Trim, Complete Stainless Steel Pilot <br />System, Opening & Closing Speed EA 2 <br />� <br />$ d, 7Ss UU <br />$ 17 .00, 00 <br />Controls, Up Stream & Downstream <br />Pressure Gauges, X101 Valve Position <br />Indicator <br />23. Complete New 8" Model 90-01 1501b <br />Flanged/Epoxy Coated, Stainless Steel <br />Trim, Complete Stainless Steel Pilot <br />System, Opening & Closing Speed EA 2 sL2 W5,100 $ -2 5'70, 0(U <br />Controls, Up Stream & Downstream �— <br />Pressure Gauges, X101 Valve Position <br />Indicator <br />24. Complete New 10" Model 90-01 1501b <br />Flanged/Epoxy Coated, Stainless Steel <br />Trim, Complete Stainless Steel Pilot <br />System, Opening & Closing Speed EA 2 $ f 6� S 00 $ 3T0, 0 0 <br />Controls, Up Stream & Downstream <br />Pressure Gauges, X101 Valve Position <br />Indicator <br />25. Complete New 12" Model 90-01 1501b <br />Flanged/Epoxy Coated, Stainless Steel <br />Trim, Complete Stainless Steel Pilot/////�'��'/ //yyyyy///���+++yy��' <br />System, Opening & Closing Speed EA 2 $ ?I/• oc $ 7/� <br />4� (-k2,,00 <br />Controls, Up Stream & Downstream <br />Pressure Gauges, X101 Valve Position <br />Indicator <br />26. Complete New 14" Model 90-01 1501b <br />Flanged/Epoxy Coated, Stainless Steel <br />Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ Y0r_d w. Co $ �l 69�Oi 0 O <br />Controls, Up Stream & Downstream <br />Pressure Gauges, X101 Valve Position <br />Indicator <br />27. Complete New 16" Model 90-01 1501b <br />Flanged/Epoxy Coated, Stainless Steel / � <br />Trim, Complete Stainless Steel Pilot EA 2 $ /3 W 9 60 $ 87 749. 00 <br />System, Opening & Closing Speed �— T <br />Controls, Up Stream & Downstream <br />Pressure Gauges, X101 Valve Position <br />Indicator <br />City of Santa Ana RFP 24-050 <br />Flow Control Valve Maintenance and Rehabilitation Services <br />Page 22 <br />City Council 21 — 75 8/6/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.