My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - ZOA No. 20204-01 South Coast Technology Center
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024
>
Item 28 - Public Hearing - ZOA No. 20204-01 South Coast Technology Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 9:17:46 AM
Creation date
8/6/2024 8:50:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
8/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Coast Technology Center Project <br />CEQA Exemption 15183 <br />4.18.4 Applicable GPU PEIR Regulatory Requirements/Mitigation Measures: <br />Refer to Section 4.5, Cultural Resources, for RR CUL-1 and MM CUL-7. <br />4.19 Utilities and Service Systems <br />4.19.1 GPU PEIR Findings <br />The GPU PEIR concluded that buildout of the General Plan Update would increase sewer flows <br />and sewer upgrades may be needed to achieve optimal hydraulic capacity. However, the City's <br />Sewer Master Plan and Capital Improvement Program process would adequately prioritize <br />necessary projects as developments under the General Plan Update occur. Additionally, as <br />described in the GPU EIR any project within the City and under the GPU that goes through the <br />entitlement process would be required to perform a sewer monitoring study with submittal and <br />review of the study by City staff. If the sewer system is found to be deficient, the developer would <br />be required to upsize the portion of the sewer pipe within the frontage of their property in <br />accordance with City standards and could pay for the upsize through agreements with the Orange <br />County Sanitary District (OCSD). <br />The GPU PEIR also concluded that OCSD wastewater treatment plants would have the capacity <br />to accommodate the increased flows generated by the buildout of the General Plan Update. <br />Additionally, the GPU PEIR states that that any sewer utility infrastructure improvement would be <br />designed, constructed, and operated in accordance with the City's Design Guidelines for Water <br />and Sewer Facilities, and development would be required to abide by the requirements of OCSD's <br />ordinances and wastewater discharge requirements of the NPDES permit. Overall, with <br />compliance with General Plan Update policies related to wastewater and implementation of RR <br />U-1 through RR U-3, impacts related to wastewater infrastructure and wastewater treatment <br />facilities were determined to be less than significant. <br />The GPU PEIR concluded that buildout of the General Plan Update would increase water <br />demand, but the City would have adequate capacity for the proposed increases in water demand <br />across the City and adequate supplies from the City, Orange County Water District, and <br />Metropolitan Water District of Southern California to meet the increased demand. Furthermore, <br />policies in the General Plan Update encourage business and industry to improve their <br />performance in water conservation, promote the implementation of cost-effective conservation <br />strategies and programs that increase water -use efficiency, and encourage and educate <br />residents, business owners, and operators of public facilities to use water wisely and efficiently. <br />Policies also promote the maintenance and upgrade of water infrastructure through impact fees <br />from new development and use of drought -tolerant landscape. Overall, with compliance with <br />General Plan Update policies related to water and implementation of RR U-5 through RR U-7, <br />impacts related to water infrastructure and supply were determined to be less than significant. <br />The GPU PEIR concluded that, while the City is largely developed, buildout of the General Plan <br />Update would result in vacant lots being developed into higher -intensity uses that could increase <br />peak -flow runoff. However, the City has policies in place for reviewing and permitting new <br />developments, which includes review of potential increases in runoff. Policies in the General Plan <br />Update also encourage site drainage features that reduce impermeable surface area, increase <br />surface water infiltration, and minimize surface water runoff during storm events on private and <br />public developments. Overall, with compliance with General Plan Update policies related to <br />drainage and stormwater and implementation of RR U-8.1, RR HYD-1, and RR HYD-4, impacts <br />related to stormwater drainage were determined to be less than significant. <br />July 2024 Page 96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.