Laserfiche WebLink
SECTION I <br />ta <br />www.FinanceDTA.com <br />EXECUTIVE SUMMARY <br />Figure 1: Aerial Map for the Project Site <br />The Project proponent is proposing to demolish the existing office buildings and <br />appurtenant infrastructure on the Project site,and to amend the permissible uses of SD-58 <br />for the Project site to include limited light industrial uses ("LLIUs"), including but not limited <br />to product assembly, the manufacture of biological, biomedical, and pharmaceutical <br />products, the manufacture of scientific, engineering, and medical instruments, wholesale, <br />warehousing, machine and other metal working shops, and research laboratories. <br />As illustrated in Figure 2 and presented in Table 1 on the following page, the Project site is <br />proposed to be redeveloped with three buildings encompassing approximately 313,244 <br />building square feet ("BSF") of LLIU space. <br />Figure 2: Proposed Project Site Plan <br />PRE <br />Bullying <br />ul <br />2 <br />og <br />11 <br />`wilding <br />I <br />2B <br />-_I <br />4aSEl— <br />- <br />- <br />1I <br />r 1.r <br />I <br />10 <br />I <br />I <br />EPD Solutions, Inc. <br />South Coast Technology Center Fiscal Impact Analysis Report <br />el. <br />iiiiii� iiil iI111ni!L! <br />OVERALL SITE PLAN <br />South Coast . <br />Technology Center <br />May 13 2024 <br />/ 2 <br />