Laserfiche WebLink
South Coast Technology Center Project <br />CEQA Exemption 15183 <br />Surrounding uses adjacent to the Project Site include office, commercial, government, and <br />recreational uses. To the north of the Project Site, across from West Lake Center Drive, is the <br />Calvary Chapel Private School Program support facility and athletic fields. Surface parking, a <br />parking structure, and the Greenville Banning Channel bound the Project Site to the east. To the <br />south of the Project Site are office buildings, surface parking lots, and a U.S. Postal Service <br />facility. Freight rail tracks bound the Project Site to the west. <br />2.3 General Plan Designation and Zoning <br />According to the General Plan Update Land Use Element Figure LU-1, Land Use Map, the Project <br />Site is designated Industrial (IND).2 The Industrial designation provides space for activities such <br />as light and heavy manufacturing, warehousing, processing, and distribution as well as <br />commercial uses ancillary to industrial activities. According to the General Plan Update Land Use <br />Element Table LU-3, Density and Intensity Standards, the Industrial designation generally allows <br />a maximum 0.45 floor -area -ratio (FAR) with a typical maximum building height of 35 feet. <br />However, Table LU-3 provides a specific exception for the Lake Center Development, defined by <br />Specific Development Plan Number 58 (SD-58), that allows intensities up to 0.72 FAR (see <br />Footnote 4 of General Plan Update Land Use Element Table LU-3). Similarly, regarding height, <br />Table LU-3 Footnote 2 explains that the actual maximum standard allowed on each site may be <br />different than listed in Table LU-3 and that the allowable height of development on any parcel is <br />subject to the zoning standards. <br />Based on the City of Santa Ana Zoning Map (Zoning Map), the Project Site is zoned SD-58. <br />According to Ordinance No. NS-2089, permitted uses in the SD-58 District are professional and <br />business offices providing personal and professional services including employment agencies, <br />medical insurance, real estate, travel, trade contractors, architects, engineers, finance, research <br />and development, and other similar use. The SD-58 District also allows commercial/retail uses, <br />including service commercial uses such as daycare centers, banks and other financial institution, <br />delicatessens, food stores, newsstands, automobile support facilities, health and exercise centers <br />and other similar uses, office and computer equipment, copy centers and other similar uses, office <br />and computer equipment, postal centers, restaurants, travel services, and other similar uses. The <br />SD-58 District permits a maximum FAR of 0.72 and a maximum height of 200 feet for the Project <br />Site. <br />2.4 Project Characteristics <br />The Project proposes to demolish the Lake Center Office Park, including the three existing <br />buildings, a parking structure, and parking lots to construct three new Class A industrial buildings <br />for office, manufacturing, and/or warehouse use. The three existing buildings within the Lake <br />Center Office Park that would be demolished are located on the eastern portion of the Project <br />Site and total 178,026 square feet. The total site area of 689,310 square feet (15.8 net acres) <br />across the Project Site would be divided into two lot areas containing three buildings. Two new <br />buildings (Buildings 2 and 3) would be constructed to replace the Lake Center Office Park and <br />one new building (Building 1) would be constructed on the vacant field to the west of Susan Street; <br />refer to Figure 3, Conceptual Site Plan. The three proposed Class A buildings would result in a <br />total building square footage of 313,244 square feet. Each building would have a truck dock and <br />a potential mezzanine located opposite the truck dock. A total of 497 parking stalls would be <br />provided for the Project. The characteristics of each building are as follows: <br />2 City of Santa Ana, Golden City Beyond, Santa Ana General Plan Land Use Element, Figure LU-1, Land Use Map, <br />April 2022. <br />July 2024 Page 9 <br />