Laserfiche WebLink
South Coast Technology Center Project <br />CEQA Exemption 15183 <br />The Project would redevelop the Lake Center Office Park with two new industrial buildings and <br />would construct a new industrial building on the vacant parcel west of Susan Street. The proposed <br />Project would include accent walls, high quality landscaping, and monument signage at the <br />primary entryways to the Project Site that would add visual interest to the site. Although the <br />proposed Project would require an amendment to the SD-58 District to allow for industrial uses, <br />the Project Site's zoning would be consistent with the General Plan Update land use designation <br />of Industrial. The Project would be required to comply with updated development standards <br />governing aesthetics for the SD-58 District, which include building heights, setbacks, separations, <br />landscaping standards, and signage. Other than the addition of development standards for <br />perimeter fencing and parking, the development standards for the SD-58 District remain <br />essentially unchanged with the proposed SD-58 amendment. Additionally, no change in density <br />or building height is proposed for SD-58. The proposed buildings would be consistent with or <br />shorter than the heights of the existing buildings. Furthermore, the proposed Project would comply <br />with RR AE-1 through RR AE-3. Therefore, the Project would not degrade the existing visual <br />character of the Project Site or conflict with applicable zoning or other regulations governing <br />scenic quality. <br />Additionally, the proposed Project would comply with existing outdoor lighting standards for <br />nonresidential buildings in SAMC Section 8-211, Special commercial building provisions, which <br />require lighting to be contained on -site. Proposed nighttime lighting on -site for the outdoor areas <br />would be limited to security, parking, and accent lighting. Therefore, the Project would not create <br />a new source of substantial light or glare that would adversely affect day or nighttime views. <br />Based on the above, impacts related to aesthetics would be less than significant and similar to <br />the impacts identified in the GPU PEIR. The Project would not result in new or substantially more <br />severe impacts compared to the determination in the GPU PEIR, which concluded that impacts <br />would be less than significant. As such, no new project -specific mitigation measures are required. <br />4.1.3 Conclusion <br />The Project is consistent with the General Plan Update. With implementation of RR AE-1 through <br />RR AE-3 identified in the GPU PEIR, the proposed Project would not have any specific effects <br />which are peculiar to the Project or the Project Site. There are no project -specific impacts or <br />potentially significant off -site or cumulative impacts that the GPU PEIR did not analyze, and there <br />are no new significant or substantially more severe aesthetic impacts than anticipated by the GPU <br />PEIR. <br />4.1.4 Applicable GPU PEIR Regulatory Requirements/Mitigation Measures: <br />RR AE-1 The City shall enforce adherence with the California Building Code, including <br />provisions of the Building Energy Efficiency Standards related to lighting. <br />RR AE-2 The City shall enforce development standards and other general provisions as <br />detailed in the Zoning Code (Chapter 41 of the Municipal Code) to ensure <br />consistency between the City's General Plan and proposed development projects. <br />This includes compliance with the requirements of any ordinance adopting specific <br />development plans. <br />RR AE-3 The City shall enforce the development standards and design guidelines of <br />adopted specific plans. In addition to these specific plans, the City will enforce the <br />development standards of the Metro East Mixed -Use Overlay Zone for each district <br />within the overlay area. <br />July 2024 Page 17 <br />