My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FRIENDSHIP SHELTER, INC.
Clerk
>
Contracts / Agreements
>
F
>
FRIENDSHIP SHELTER, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2024 5:54:13 PM
Creation date
8/26/2024 9:41:37 AM
Metadata
Fields
Template:
Contracts
Company Name
FRIENDSHIP SHELTER, INC.
Contract #
A-2002-043-03
Agency
Community Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Federal Register/'Vol. 6,t 178 / Wednesday. September 15, 15� i Iles and Regulations 50231 <br />Crront and citV: <br />Appendix B—Sample Summary Risk <br />Assessment Notice Format <br />ndix will not <br />appear This 'following <br />Federal intheCode of Regulations <br />Summary Notice of Lead -Based Paint Risk <br />Assessment <br />Addressnocation of property or structure (s) <br />this summary notice applies to: <br />Date: <br />Organization: <br />Street and city: <br />State: _ ZIP: — Phone number: <br />Appendix C--Sample Summary <br />Presumption Notice Format <br />Note: The following appendix will not <br />appear in the Code of Federal Regulations <br />Notice That Lead -Based Paint or Lead -Based <br />Paint Hazards Are Presumed to be Present <br />Address/location of property or structure(s) <br />this notice of presumption applies to: <br />Type of presumptian (check all that apply): <br />(a) �- Lead -based paint is presumed to be <br />lead -based paint risk assessment description: present, <br />{b) �, Lead -based paint hazard(s) is(are) <br />Date(s) of risk assessment: -- resumed to be present. <br />Summary of risk assessment results (check Spy of presumption. List at least the <br />all that apply): paint hazards were housing unit numbers and common areas (€or <br />(a) No lead -based p multifamily housing). bare soil locations, <br />found paint hazards were dust -lead locations. and/or building <br />(b) _,,,�, Lead -based pal components (tncludh g type of room or <br />found. of the findings of space. and the material underneath the <br />(c) A brief summary s of lead -based paint hazards <br />the risk assessment is see paint <br />bhlo�ds pajnO, and resumed to be present: <br />(required if any lead -based p P <br />were found). <br />Summary of types and locations of lead - <br />based paint hazards. List at least the housing <br />unit nunsbem and common <br />(eons, <br />multifamily housing). <br />dust -lead locations, and/or building oom or <br />components (including type <br />space, and the material underneath the <br />paint). and types of lead -based paint hazards <br />found: <br />Contact person for more information about <br />the risk assessment: <br />Printed name: <br />prgattization: <br />Street and city: <br />State: _ Zip: _ Phone number: <br />Person who prepared this summary notice: <br />Printed name: <br />Signature: <br />Contact person for more information about <br />the presumption: <br />Printed name: <br />organization: <br />Street and city: <br />State: —ZIP. Phone number. <br />Person who prepared this notice of <br />presumption: <br />Printed name.• <br />Signature: <br />Date: <br />Organization: <br />State: _zip- _Phone number: L_1 . <br />Appendix D—Sample Hazard <br />Reduction Completion Notice Format <br />Note: The following appendix will not <br />appear in the Code of Federal Regulations. <br />Summary Notice of Completion of Lead - <br />Based Paint Hazard Reduction Activity <br />AddressllocatiOW-bf property or structures) <br />this summary notice applies to: <br />Summary of the hazard reduction activity: <br />Start and completion date(s): <br />Activity locations and types. List at least the <br />housing unit numbers and common areas (for <br />multifamily housing), bare soil locations. <br />,dust -lead locations, and/or building <br />components (including type of room or <br />space. and the material underneath the <br />paind. and types of hazard reduction <br />activities performed at the locations listed: <br />Date(s) of Clearance testing and/or soil <br />analyses:.. —,- <br />Locations of building components with lead - <br />based paint remaining in the rooms. spaces <br />or areas where activities were conducted: <br />Summary orresults of clearance testing and <br />soil analyses: <br />(a) No clearance testing was <br />performed. <br />(b) _ Clearance testing showed <br />clearance was Clearance testing achieved. <br />clearance <br />(c) <br />was not achieved. <br />Contact person for more infornation about <br />the hazard reduction: <br />Printed name: <br />Organization: <br />Street and city: <br />state: —ZIP: <br />Phone number: C_--a notice: <br />Person who prepared this summary <br />Printed name: <br />Signature: <br />Date. <br />Organization: <br />Street and city: <br />State: —ZIP.' <br />Phone number. { `) <br />[FR Doc. 99--23016 Filed 9-14-99: 8:45 aml <br />131LU VG CODE 4210-32-P <br />
The URL can be used to link to this page
Your browser does not support the video tag.