My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARPER & ASSOCIATES
Clerk
>
Contracts / Agreements
>
H
>
HARPER & ASSOCIATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:29:56 AM
Creation date
9/4/2024 3:33:12 PM
Metadata
Fields
Template:
Contracts
Company Name
HARPER & ASSOCIATES
Contract #
A-1998-001
Agency
Public Works
Destruction Year
2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Shall not exceed limitations of CONSULTANT'S <br />AUTHORITY as set forth in the Agreement or the Contract <br />Documents, <br />(3) Shall not undertake any of the responsibilities of <br />CONTRACTOR, subcontractor or CONTRACTOR'S <br />superintendent. <br />(4) Shall not advise on, issue directions relative to or assume <br />control over safety precautions and programs in correction <br />with the work. <br />(5) Shall not advise on, issue directions regarding or assume <br />control over any aspect of the CONTRACTOR'S means, <br />methods, techniques, sequences or procedures of construction <br />unless such advice or directions are specifically required by <br />the Contract Documents. <br />(6) Shall not accept Shop Drawings or sample submittals from <br />anyone other than CONTRACTOR, and shall immediately <br />deliver such submittals to ENGINEER/OWNER. <br />(7) Shall not authorize ENGINEER/OWNER to occupy the <br />Project in whole or in part. <br />(8) Shall not participate in specialized field or laboratory tests or <br />inspections conducted by others except as specifically <br />authorized by ENGINEER/OWNER. <br />b. Definitions: <br />(1) ENGINEER/OWNER is intended to apply as a joint reference <br />or a single reference subject to the applicable circumstances. <br />II. COST ESTIMATE <br />A. Based on previously noted Scope of Work Items for quality control inspection during <br />construction phase will be in the range of $23,595 to $27,060.00, based on project <br />duration of 60 working days for total reservoir coating project, determined from <br />specification. This is based on Inspector working 8 hours per day, 5 days per week, <br />Monday through Friday. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.