My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIRST AMERICAN TITLE COMPANY
Clerk
>
Contracts / Agreements
>
F
>
FIRST AMERICAN TITLE COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:51:51 PM
Creation date
9/5/2024 12:55:22 PM
Metadata
Fields
Template:
Contracts
Company Name
FIRST AMERICAN TITLE COMPANY
Contract #
A-2000-081
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEVEL II — 240,000 square feet <br />1K <br />At Halladay/Dyer intersection, convert existing westbound right turn <br />200,000 <br />lane to a third westbound through lane at intersection <br />1H* <br />At southwest corner Main/MacArthur intersection, add an eastbound <br />250,000 <br />120,000 <br />ri ht-turn lane and modify traffic signal as needed <br />SUBTOTAL <br />450,000 <br />120,000 <br />LEVEL III — 300,000 square feet <br />1J <br />At intersection of Main and Dyer convert existing northbound right -turn <br />lane to a through lane. <br />300,000 <br />SUBTOTAL <br />300,000 <br />LEVEL IV -- 297,000 square feet*** <br />3A**** <br />Construct Alton overpass at SR-55 and widen to our lanes between <br />Standard and Main Street. <br />12,000,000 <br />3B1 <br />Widen Halladay to four lanes between Columbine and Alton. <br />7,500,000 <br />3B2** <br />Install a traffic signal at Halladay and Alton <br />120,000 <br />3C**** <br />Widen Main Street to six lanes between Columbine and Warner. <br />1,700,000 <br />3D**** <br />Widen Dyer (southside) to provide three lanes between Halladay <br />and Main. <br />2,100,000 <br />** <br />Install traffic signals at the following impacted intersection when <br />warranted: <br />MacArthur Place (formerly Majestic Drive) @ Imperial Promenade <br />MacArthur Place (formerly Majestic Drive) @ Majestic East <br />Columbine Drive @ Hallada Street <br />360,000 <br />SUBTOTAL <br />480,000 <br />23,300,000 <br />TOTAL <br />3,297,530 <br />24,280,000 <br />* Denotes fee in lieu of constructing improvement or not to exceed cost to do as <br />agreed between Developer and City. <br />** = Maximum contribution per intersection will be $120,000 <br />*** = Maximum Level IV "Developer" contribution is $900,000 as defined in main text at Paragraph <br />5.e(3). <br />**** = Projects are area -wide mitigation measures and are not part of this project. The City intends that <br />these projects be completed about the time the third phase street improvements are completed but <br />these additional projects are not mitigation measures for the MacArthur Place project. (EIR, Table <br />1, Note (c).) <br />394/016555-0002 <br />72059.05 a05130100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.