My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-09-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Agenda Packet_2024-09-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 9:10:51 AM
Creation date
9/11/2024 8:59:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br /> SECTION X <br />CONCLUSION <br /> <br /> <br /> <br />Related Bristol at 3600 South Bristol Street September 27, 2023 <br />Land Residual Value Study Report <br /> <br />www.FinanceDTA.com <br />X CONCLUSION <br />DTA reviewed the Specific Plan to understand the proposed Project. We obtained market <br />information from CoStar for multifamily, retail, hotel, and congregate care products for both <br />Orange County and a 2-Mile Zone surrounding the Project site. We also reviewed the City’s <br />website for development regulations and standard plans for construction projects. DTA <br />assessed DIFs currently being imposed by the City from various government websites. <br />DTA referred to its database for development costs and reviewed similar projects to budget <br />the indirect costs, marketing costs, and financing costs that are discussed above. We <br />prepared a Project cash flow in accordance with the Project timing described in the Specific <br />Plan. <br />Often, large-scale development projects are amended as more information is analyzed. <br />Product mixes may change after the completion of detailed market studies that may identify <br />alternative product mixes and product types that may yield better financial metrics. DTA <br />assumed that the final land plan and individual buildings may be modified to address the <br />evolving marketplace during the life of the Project, which the Specific Plan identities will be <br />completed in 2035. <br />In preparing our Report, DTA evaluated the Specific Plan and determined that the Project <br />would be financially successful based upon the available information, although we <br />acknowledge Project metrics may change as more information becomes available. Based <br />upon the information reviewed, DTA determined that the proposed Project would be <br />profitable since the Project’s NAV is $597,895,000, as shown in Table 49 below. <br />Table 49: NAV Summary <br />Description Value <br />Total NAV $2,377,266,000 <br />Total Costs ($1,779,371,000) <br />Excess of NAV Over Costs $597,895,000 <br /> <br />Exhibit 10 <br /> <br /> <br />City Council 22 – 519 9/17/2024
The URL can be used to link to this page
Your browser does not support the video tag.