My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-09-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Agenda Packet_2024-09-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 9:10:51 AM
Creation date
9/11/2024 8:59:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMORANDUM <br />Ali Pezeshkpour, Planning Manager <br />City of Santa Ana Planning Division <br />August 31, 2023 <br />2.21.4410 <br />To:Date: <br />Zdenek “Zed” Kekula, P.E. Principal Civil Engineer <br />City of Santa Ana Public Works Agency – Traffic <br />Engineering <br />xc: <br />Richard Barretto, P.E., PrincipalFrom:LLG Ref: <br />Linscott, Law & Greenspan, Engineers <br />Response to Additional Caltrans Traffic Operations Comments on Related <br />Bristol Specific Plan - Santa Ana, CASubject: <br />Linscott, Law & Greenspan, Engineers (LLG) is pleased to provide the following <br />responses to address the additional Caltrans Traffic Operations division comments on <br />the LLG response memorandum dated August 16, 2023 as summarized in an email <br />dated August 28, 2023 (see attached email for reference). <br />Caltrans Traffic Operations <br />Traffic Operations Comment 1: The Memorandum prepared by Linscott Law & <br />Greenspan Engineers on August 16, 2023, Page 3, indicates that the intersection of <br />Bear Street at SR-73 NB Ramps (Intersection No. 37) has forecasted to operate at <br />unacceptable LOS E in the PM peak hour, without or with Project traffic and <br />recommended improvements for Bear Street at SR-73 NB Ramps (Intersection No. <br />37). The recommended improvements include the following: No. 37 – Bear Street at <br />SR-73 NB Ramps: Restripe the existing westbound left-turn lane to provide a shared <br />left/right-turn lane. Modify the existing traffic signal as necessary. <br />Please provide fair share calculation for this recommendation and contact <br />information of the agency and company that is working on this improvement. <br />Response to Comment 1: Table A , attached at the end of this memorandum, <br />presents the Project’s fair-share contribution to construct the recommended <br />improvements at Bear Street and SR-73 NB Ramps. As presented in Table A, the first <br />column (1) lists the total intersection peak hour traffic for existing conditions. The <br />second column (2) presents Year 2045 Buildout Traffic, while the third column (3) <br />presents Year 2045 Buildout Plus Project Phases 1, 2 and 3 traffic. The Project- <br />related added traffic volumes during AM peak hour and PM peak hour are presented <br />in the fourth column (4). The fifth column (5) represents what percentage of total <br />added intersection peak hour traffic is Project-related traffic. <br />Review of Table A shows that the proposed Project fair-share cost responsibility at <br />the Bear Street / SR-73 NB Ramps intersection totals 6.31%. <br />The City of Santa Ana is the lead agency in the review and approval of the proposed <br />Related Bristol Specific Plan project. <br /> <br /> <br />City Council 22 – 602 9/17/2024
The URL can be used to link to this page
Your browser does not support the video tag.