Laserfiche WebLink
<br />TABLE A <br />YEAR 2045 BUILDOUT PROJECT FAIR-SHARE COST CONTRIBUTION <br />(3)(5)(2)Year 2045 <br />Buildout Plus <br />Project Phases <br />1, 2 and 3 <br />ProjectYear <br />2045 <br />Buildout <br />Traffic <br />(1)(4)Fair- <br />ShareTimeExisting <br />Traffic <br />Project <br />TrafficKey Intersection Jurisdiction Period Improvement Description Traffic Percent <br />.Restripe the existing <br />WB left-turn lane to <br />provide a shared <br />Bear Street at <br />SR-73 NB Ramps <br />Costa Mesa/ <br />Caltrans <br />AM <br />PM <br />2,166 <br />3,664 <br />2,788 <br />4,706 <br />2,859 <br />4,747 <br />71 <br />4137.6.31% <br />left/right-turn lane <br />Note: <br />Project fair-share percentage, which considers both the AM peak hour and PM peak hour traffic volumes, is calculated as such: <br />Column (5) = [Column (4)] / [Column (3) – Column (1)] x 100%. <br />  <br />  <br />City Council 22 – 605 9/17/2024