My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-09-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Agenda Packet_2024-09-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 9:10:51 AM
Creation date
9/11/2024 8:59:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Bristol St Improvements & Widening: <br />Phase 3A - Civic Center-Washington <br />The Bristol Street Improvements project was planned and designed to <br />incorporate complete street concepts with storm drain quality features. <br />The improvements include widening of the street from four lanes to six <br />lanes, with bus turnouts, raised median, bike lanes, and sound walls. The <br />project also brings native and organic landscaping that beautifies a fully <br />developed urban area. <br />Bristol Street from Civic Center to Washington (Phase 3A) is part of the <br />City's plan to widen Bristol Street from Warner Avenue to Memory Lane, <br />which was approved by City Council in 1990 and reevaluated in 2015. <br />Existing roadway has only 2 lanes in each direction and is operating at a <br />LOS F. This widening is needed to improve traffic flow and create complete <br />streets features.PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />PROJECT COSTS FY 24/25 <br />5,199,933 <br />5,199,933 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction ------ <br />TOTAL ------ <br />SOURCE OF FUNDS <br />DEMO <br />FY 24/25 <br />656,000 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />OCTA BRISTOL ST CORRIDOR <br />TSIA AREA F <br />3,343,933 <br />1,200,000 <br />5,199,933TOTAL <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineeringg Jason Gabriel, Principal Civil Engineeerr 21-Aug-2024 <br /> <br /> <br />City Council 16 – 116 9/17/2024
The URL can be used to link to this page
Your browser does not support the video tag.