My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-09-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Agenda Packet_2024-09-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 9:10:51 AM
Creation date
9/11/2024 8:59:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN'TA ANA REBID <br />PROPOSAL <br />PRO.IECT NO. 20-6965, ATP 5063(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND S',r <br />PROJECT NO. 20-6962, ATP 5063(198) MCFADDEN AVE BIKEWAY I'ROM I]ARBOR BT.VD TO GRAND AVE <br />PROJECTNO. 23-6707 _ STANDARDAVE PAVEMENTREI{ABILII.A.TION IROM WARNERAVE TO 2ND SI <br />PROJI'Ij'1 N0. 23-6705 - MCt'Al)l)liN AVI PAVi-lM F.N'l trF.tJAB[,Il A ftoN I-ROM HAI{BOR t]t.Vt) 10 ITATRVI.]W S IPROJECI'NO. 19.6923 _ MC}ADDEN AVE PAVEMENT REHABILITA'IION FROM TAIRVIEW ST TO RAITT ST. PROJECT NO. 23-6706 - MCFADDEN AVE PAVEMENT REHABILMATION FROM RAITT ST TO GRAND AI,IE <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Vido Samarzich, lnc. <br />REQUIREMENT: <br />The undersigned bidder declares that tliey have carefllly examined the location of the proposecl <br />work, that they have exautinecl the Coniract Documents in its eutirety ancl hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if anv) and the specifications for the unit price(s) or lump surn(s) ser forrh in the following <br />schedule: <br />BASE BID: <br />20-6965, ATP s063(196) - STANDARD A\1E BIKEWAY FRON'I \,VARNER A\/E TO 2\r) ST <br />2O-6962, ATP 5063(19f]) - MCFADDEN AVE BIKEWAY FRONI HARBOR BLVD TO CRAND A\/E <br />19-6923 _ MCFADDEN AVE PA\/f,MENT REIIABILTTATION FROIII FAIRVIEW ST TO RAITT ST <br />Item Description Qty thit Unit Price Amount <br />I STORM WATER POLLUTION <br />PREVENTION PLAN (SWPPP) . <br />RISK LEVEL 2 <br />I LS $ <br />600,000.00 <br />$ <br />600,000.00 <br />2 T INCI,ASSIFI ED EXCAVATION,,.6,1'73 CY :[ <br />200.00 <br />$ <br />1,234,600.00 <br />3 REMOVE EXISTING TREE 2 EA $ <br />3,000.00 <br />$ <br />6,000.00 <br />4 COLD PLANE EXISTING <br />ASPHALT CONCRETE <br />PAVEN4ENT (2" IVfAX) <br />299.410 SF $ <br />0.66 <br />$ <br />197,610.60 <br />5 CONSTRUCT ASPHALT <br />RUBBER HOT MIX (THICKNESS <br />PER PLAN)* <br />J)t')TON :[ <br />200.00 <br />S <br />842,400.00 <br />6 CONSTRIJCT ASPHALT <br />C'ONCRETE PAVEMENI'X <br />1.1 00 TON $ <br />240.00 <br />$ <br />744,000.00 <br />7 CONSTRUCT AGGREGATE <br />BASE* <br />370 TON $ <br />100.00 <br />$ <br />37,000.00 <br />8 CONSTRUCT MOD]FIED <br />CONCRETE CURB AND <br />GI]TTER TYPE A-2-8 PER C S A. <br />sTD PLAN NO. I l0l WITH I' <br />GUTTER PLATE PAN <br />8.570 LF $ <br />80.00 <br />$ <br />685,600.00 <br />9 CONSTRUCT CONCRETE CURB <br />AND GUTTER TYPE A-2-8 PER <br />C.S.A. STD PLAN NO. I ioi <br />2.450 LF $ <br />80.00 <br />S <br />196,000.00 <br />P-l ofP-30 <br />EXHIBIT 2 <br /> <br /> <br />City Council 18 – 19 9/17/2024
The URL can be used to link to this page
Your browser does not support the video tag.