|
CITY OF"SANTA ANA
<br />PROPOSAL
<br />REBID
<br />ADDENDUM NO.
<br />PROJECT N0. 20-6965, ATP 5063(196) - IiI'ANDARD AVE BIKEWAY lrt{oM WAI{NEII AVD'tO 2ND STPROJECT NO. 20.6962, A'TP 5063( I98)- MCFADDEN AVE BIKEWAY FITOM I.IAI{I]OI{ BLVD TO GMND AVI.]PROJECT N0. 23'6707 - STANDARD AVE PAVEMENT REI-IABII-lTA'rlON FROtvt WARNER AVE.t'O 2ND St.PROJEC'r NO. 23-6705 - fi'ICFADDEN AVE PAVEIVIENI'REI-IABII.I'|A'I]ON FROM HATUJOR IILVD.IO FAIRVIE\,v STPROJECT NO. 19.6923 - MCFADDEN AVE PAVEMENT REI{ABILII'ATION I]ITOM ITAIRVIEW ST 'TO RATTT STPROJECT NO 23-6706 - N'ICFADDEN AVE PAVEMEN'I RIHABILITA]]ON I:ROI\4 I{AI rT ST T'O GRAND AVE
<br />Itern Description Qtl'Unit Unit f'rice Arnount
<br />r03 INSI'AI,T, I P C]OJVIM tJNI CATION
<br />SYSTEI\,{S
<br />I t., si s
<br />102,000.00
<br />$
<br />'102,000.00
<br />r04 INSTi\t,|. 120 STITAND SICNAI-
<br />MODE FIBER oP',UC (SN4FO)
<br />CABLE
<br />2.142 LF $
<br />3.40
<br />$
<br />7,282.80
<br />I05 INSTAI,I, I2 STRAND SICNAL
<br />MODE FTBER OPl'tC (Stvltro)
<br />CABLE
<br />2,280 I-F'$
<br />5.60
<br />$
<br />12,768.00
<br />r06 INSTALL 24 S]'RAND SIGNAT,
<br />MODE FrBER OPTrC) (St\{}'O)
<br />CABI.E
<br />20,000 LT s
<br />2.25
<br />$
<br />45,000.00
<br />107 r{JSION SPI,ICE I STRAND Ort
<br />SINGI-E NiIODE t?tBttR Op't'tC
<br />(sMFO)
<br />36 F]A $
<br />358.00
<br />$
<br />12,888.00
<br />r08 INSTAt,I. FIt]IIR OPTIC] SPLICE
<br />CI,,OSURE
<br />22 EA $
<br />4,500.00
<br />$
<br />99,000.00
<br />109 POTI.IOLD TRAI-FIC] SICNAI,
<br />POLE LOC.]A'I.ION FOR U]'ILII'Y
<br />CONFLICT
<br />72 EA $
<br />1,680.00
<br />s
<br />120,960,00
<br />I l0 RAILI{OAD: IJPI{R PERIvfl -f
<br />1 I,S $
<br />60,000.00
<br />$
<br />60,000.00
<br />lil RAILROAD: UPRR FLAGCINC 30**DAY $ r,500 $45,000
<br />112 LANDSCAPI]I LS $
<br />300,000.00
<br />$
<br />300,000.00
<br />ll3 IT{RIGATION I t,S $
<br />650,000.00
<br />S
<br />650,000.00
<br />114 I2O.D,,\Y PLANT
<br />ESTABI-ISHMENI'
<br />I LS $
<br />10,000.00
<br />$
<br />10,000.00
<br />I 15 CONSTRUCT'ION PERI\,IIT I t,S $42.3 r9 s42,-r r9
<br />ll6 PROJECT ADVERTISEMENT
<br />SICN
<br />.)EA a
<br />2,000.00
<br />$
<br />6,000.00
<br />n7 CONSTRUC]' II" GATE VAI-VE
<br />PER C.S.A. STD PI.,AN NO. I4I().
<br />REPLACE 25'WATER MAIN
<br />BETWEEN OI.D AND NEW
<br />VALVE L,OCA]'ION WITI.I PVC
<br />PIPTJ. CONNEC'T TO EXISI"ING
<br />PIPE PER C.S.A STD I,LI\N NO.
<br />I 409
<br />I LS $
<br />35,000.00
<br />S
<br />35,000.00
<br />I l8 CONSTRUCT I2" CATE VALVE
<br />C.S,A. ST'D PLAN NO. 14I0.
<br />REPLACE 5O'WAT'ER MATN
<br />I]ETWEEN OLD AND NEW
<br />I LS S
<br />45,000.00
<br />s
<br />45,000.00
<br />P-8 o{'P-30
<br />
<br />
<br />City Council 18 – 26 9/17/2024
|