My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-09-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Agenda Packet_2024-09-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 9:10:51 AM
Creation date
9/11/2024 8:59:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> SECTION I <br />PROJECT INFORMATION <br /> <br /> <br /> <br />Related Bristol at 3600 South Bristol Street September 27, 2023 <br />Land Residual Value Study Report <br /> <br />www.FinanceDTA.com <br />targeting the look and feel of an urban village. One of the primary goals of an urban village <br />setting is that residents can walk within the community to both local-serving retail and <br />recreational amenities. The Developer responded to the City's desires by targeting a Project <br />design that would both achieve the desired urban feeling while offering an economically <br />successful project. <br />The plan is to develop a dense urban village with ground-floor retail in all the residential <br />buildings. The Specific Plan is designed to harmonize with the high-rise office buildings in <br />the Arts District to the east. Another benefit of the program is that at build-out, there could <br />be as many as 6,750 residents living in the village who would shop at the proposed <br />350,000 SF of retail. <br />Figure 1: Artist’s 3-D Rendering of Project <br /> <br />We based our product mix on the approved Specific Plan. Based upon an artist’s rendering <br />of the site (as shown in Figure 1), we estimated the height of the buildings. It was assumed <br />that all multifamily buildings would include ground-floor retail. A 250-room upscale hotel, <br />with approximately 20 stories, is anticipated to be developed in the southwest corner of the <br />Project site. The Specific Plan also proposes a 20-story, 200-unit congregate care facility to <br />be built-out in Phase 1. <br />As stated in the Specific Plan, DTA based our model on the understanding that the Project <br />shall be completed in three phases, as shown in Table 2. <br />Table 2: Project Schedule <br />Activity Start/End Phase 1 Phase 2 Phase 3 <br />Approved TTMs Start June 2022 June 2022 June 2022 <br />End December 2025 December 2025 December 2025 <br />Horizontal <br />Construction <br />Start December 2025 June 2029 March 2032 <br />End June 2029 December 2031 June 2034 <br />Vertical <br />Construction <br />Start June 2026 December 2029 September 2032 <br />End March 2030 December 2032 May 2035 <br />Sales Start March 2027 September 2030 June 2033 <br />End March 2030 December 2032 May 2035 <br /> <br />Exhibit 10 <br /> <br /> <br />City Council 22 – 487 9/17/2024
The URL can be used to link to this page
Your browser does not support the video tag.