Laserfiche WebLink
25 <br /> SECTION V <br />LAND IMPROVEMENT DIRECT <br />COSTS <br /> <br /> <br /> <br />Related Bristol at 3600 South Bristol Street September 27, 2023 <br />Land Residual Value Study Report <br /> <br />www.FinanceDTA.com <br />Table 30: Sanitary Sewer Estimate <br />Sanitary Sewer System Phase 1 Phase 2 Phase 3 Total <br />Apartment $2,306,550 $784,470 $598,790 $3,689,810 <br />Commercial $10,875 $0 $0 $10,875 <br />Hotel $10,875 $0 $0 $10,875 <br />Congregate $10,875 $0 $0 $10,875 <br />Amenity $43,500 $10,875 $43,500 $97,875 <br />Backbone $500,000 $0 $0 $500,000 <br />Total Sanitary Sewer System $2,882,675 $795,345 $642,290 $4,320,310 <br />F Potable and Reclaimed Water <br />As with sanitary sewer systems, DTA estimated the costs of removing and replacing all the <br />in-tract potable water lines since we determined the Project will be moving all the <br />easements where the sewer lines are currently located. We budgeted traffic control during <br />construction. We also estimated that the City would require the Developer to install <br />non-potable water lines throughout the Project site in accordance with current City <br />requirements. <br />Table 31: Potable Water Costs <br />Potable Water Phase 1 Phase 2 Phase 3 Total <br />Apartment $2,412,300 $837,345 $559,290 $3,808,935 <br />Commercial $28,500 $0 $0 $28,500 <br />Hotel $28,500 $0 $0 $28,500 <br />Congregate $28,500 $0 $0 $28,500 <br />Amenity $114,000 $28,500 $114,000 $256,500 <br />Backbone $312,500 $0 $0 $312,500 <br />Total Potable Water $2,924,300 $865,845 $673,290 $4,463,435 <br /> <br />Table 32: Non -Potable Water Costs <br />Non-Potable Water Phase 1 Phase 2 Phase 3 Total <br />Apartment $1,130,100 $379,095 $274,503 $1,783,698 <br />Total Non-Potable Water $1,130,100 $379,095 $274,503 $1,783,698 <br />G Street Improvements <br />The estimate for street improvements includes asphalt, concrete, and streetlights. Since the <br />Specific Plan is not specific on the street profiles, DTA reviewed City standard plans and <br />made estimates for the street widths. We estimate an average streetlight with a cost of <br />$6,000 per fixture, totaling about $1.0 million upon the build-out of the Project. <br /> <br />Exhibit 10 <br />  <br />  <br />City Council 22 – 510 9/17/2024