My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 22 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:27:39 AM
Creation date
9/11/2024 11:16:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
22
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Related Bristol Mixed -Use Project <br />CEQA Findings of Fact <br />• During the entire active construction period and to the extent feasible, the use of noise - <br />producing signals, including horns, whistles, alarms, and bells, shall be for safety warning <br />purposes only. The construction manager shall use smart back-up alarms, which automatically <br />adjust the alarm level based on the background noise level, or switch off back-up alarms and <br />replace with human spotters in compliance with all safety requirements and laws. <br />• Erect temporary noise barriers (at least as high as the exhaust of equipment and breaking <br />line -of -sight between noise sources and sensitive receptors), as necessary and feasible, to <br />maintain construction noise levels at or below the performance standard of 80 dBA Leq. <br />Barriers shall be constructed with a solid material that has a density of at least 4 pounds per <br />square foot with no gaps from the ground to the top of the barrier. <br />Mitigation Measure N0I-1: Prior to the issuance of construction/grading permits, the Project <br />Applicant shall obtain a permit from the City's Building and Safety Division to complete work outside <br />the standard construction hours outlined in Santa Ana Municipal Code Section 18-314(e). In <br />addition, the Project Applicant and/or contractor(s) shall develop a nighttime construction noise <br />control plan that requires the following: <br />Stationary equipment such as generators and air compressors shall adhere to the following: <br />• Stationary equipment (e.g., generators, air compressors, etc.) shall be located 300 feet or <br />more away from residences. <br />• Stationary equipment shall be surrounded with noise barriers to achieve a minimum 10 dBA <br />reduction. Alternatively, a temporary noise barrier may be used along the property line. <br />Mobile equipment such as concrete mixer trucks, pump trucks shall adhere to the following: <br />• The nighttime noise control plan shall prohibit mobile equipment and trucks from operating <br />within the following distances to offsite sensitive receptors: <br />■ Phase 1: Trucks and equipment shall be 140 feet or more away from the Versailles <br />residences along Plaza Drive. <br />■ Phase 2: No minimum distance required (Phase 2 is 410 feet from sensitive receptors <br />and would not exceed thresholds). <br />■ Phase 3: Trucks and equipment shall be 150 feet or more away from the Versailles <br />residences along Plaza Drive. <br />• The nighttime noise control plan shall prohibit mobile equipment and trucks from operating <br />within the following distances to onsite sensitive receptors: <br />■ Phase 1: No minimum distance is required because no onsite receptors would be <br />constructed prior to Phase 1. <br />■ Phase 2: Trucks and equipment shall be 150 feet or more away from Phase 1 onsite <br />residences. <br />City of Santa Ana 70 <br />CEQA Findings of Fact <br />September 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.