My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 22 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:27:39 AM
Creation date
9/11/2024 11:16:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
22
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Related Bristol Specific Plan Project <br />Mitigation Monitoring and Reporting Program <br />TABLE 1: MITIGATION MONITORING AND REPORTING PROGRAM <br />RELATED BRISTOL SPECIFIC PLAN PROJECT FINAL SUPPLEMENTAL EIR <br />Responsible for <br />Standard Condition/ Plan, Program, Policy / Mitigation Measure/ <br />Ensuring Compliance / <br />Date Completed and <br />Condition of Approval <br />Timing <br />Verification <br />Initials <br />AIR QUALITY <br />Plan, Program, or Policy PPP AQ-1: SCAQMD Rule 403. The following <br />Prior to demolition and <br />City of Santa Ana Building <br />measures shall be incorporated into construction plans and specifications as <br />construction permits <br />Safety Division <br />implementation of SCAQMD Rule 403: <br />o All clearing, grading, earth -moving, or excavation activities shall cease <br />when winds exceed 25 mph per SCAQMD guidelines in order to limit <br />fugitive dust emissions. <br />o The contractor shall ensure that all disturbed unpaved roads and disturbed <br />areas within the Project are watered at least three (3) times daily during <br />dry weather. Watering, with complete coverage of disturbed areas, shall <br />occur at least three times a day, preferably in the mid -morning, afternoon, <br />and after work is done for the day. <br />o The contractor shall ensure that traffic speeds on unpaved roads and <br />Project site areas are reduced to 15 miles per hour or less. <br />Plan, Program, or Policy PPP AQ-2: SCAQMD Rule 1 1 13. The following <br />Prior to demolition and <br />City of Santa Ana Building <br />measure shall be incorporated into construction plans and specifications as <br />construction permits <br />Safety Division <br />implementation of SCAQMD Rule 1113. The Project shall only use "Low - <br />Volatile Organic Compounds (VOC)" paints (no more than 50 gram/liter of <br />VOC) consistent with SCAQMD Rule 1 1 1 3. <br />Plan, Program, or Policy PPP AQ-3: SCAQMD Rule 445. The following <br />Prior to demolition and <br />City of Santa Ana Building <br />measure shall be incorporated into construction plans and specifications as <br />construction permits <br />Safety Division <br />implementation of SCAQMD Rule 445. Wood burning stoves and fireplaces <br />shall not be included or used in residential dwelling units. <br />Plan, Program, or Policy PPP AQ-4: CALGreen Building Standards MERV <br />Prior to issuance of <br />City of Santa Ana Building <br />13 Filters. Indoor air quality within mechanically ventilated buildings shall <br />certificates of occupancy <br />Safety Division <br />comply with Section 5.504.5.3 (Filters) of the California Green Building <br />Standards Code Part 11 that requires utilization of at least a Minimum <br />Efficiency Reporting Value (MERV) of 13 air filtration systems. The Code <br />City of Santa Ana <br />Final Supplemental EIR <br />August 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.