My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 22 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:27:39 AM
Creation date
9/11/2024 11:16:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
22
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Related Bristol Specific Plan Project <br />Mitigation Monitoring and Reporting Program <br />Responsible for <br />Standard Condition/ Plan, Program, Policy / Mitigation Measure/ <br />Ensuring Compliance / <br />Date Completed and <br />Condition of Approval <br />Timing <br />Verification <br />Initials <br />Mitigation Measure AQ-6: Low VOC Paint (Operations). The Project <br />Prior to issuance of <br />City of Santa Ana Building <br />Applicant shall require by contract specifications for commercial development <br />certificates of occupancy. <br />Safety Division <br />to use interior and exterior architectural coatings (paint and primer including <br />parking lot paint) products that have a volatile organic compound rating of <br />10 grams per liter or less. Contract specifications shall be reviewed and <br />approved by the City of Santa Ana prior to the issuance of occupancy permits. <br />This measure shall be made a condition of approval for continued upkeep of <br />the property. <br />Mitigation Measure AQ-7: Loading Dock Connections. Prior to the approval <br />Prior to issuance of <br />City of Santa Ana Building <br />of building permits, the City of Santa Ana shall confirm the construction <br />building permits. <br />Safety Division <br />documents demonstrate an adequate number of electrical service connections <br />at loading docks for plug-in of the anticipated number of refrigerated trailers <br />to reduce idling time and emissions. <br />CULTURAL RESOURCES <br />GPU FEIR Mitigation Measure CUL-1: Identification of Historical Resources <br />Prior to issuance of <br />City of Santa Ana Building <br />and Potential Project Impacts. For structures 45 years or older, a Historical <br />grading permits. If the <br />Safety Division <br />Resources Assessment (HRA) shall be prepared by an architectural historian or <br />existing survey and <br />historian meeting the Secretary of the Interior's Professional Qualification <br />evaluation is more than <br />Standards. The HRA shall include: definition of a study area or area of <br />five years old, it shall be <br />potential effect, which will encompass the affected property and may include <br />updated. <br />surrounding properties or historic district(s); an intensive level survey of the <br />study area to identify and evaluate under federal, State, and local criteria <br />significance historical resources that might be directly or indirectly affected <br />by the proposed project; and an assessment of project impacts. The HRA shall <br />satisfy federal and state guidelines for the identification, evaluation, and <br />recordation of historical resources. An HRA is not required if an existing historic <br />resources survey and evaluation of the property is available; however, if the <br />existing survey and evaluation is more than five years old, it shall be updated. <br />GPU FEIR Mitigation Measures CUL-4: For projects with ground <br />Prior to issuance of <br />City of Santa Ana Building <br />disturbance—e.g., grading, excavation, trenching, boring, or demolition that <br />permits required to <br />Safety Division <br />extend below the current grade —prior to issuance of any permits required <br />conduct ground - <br />to conduct ground -disturbing activities, the City shall require an <br />disturbing activities <br />City of Santa Ana <br />Final Supplemental EIR <br />August 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.